Lesson E1 · Changing a Right · transfers & change cases
What a right actually yields
When a right is sold, changed or borrowed against, one paragraph decides most of its value — and it is not the decree. Lesson A2 showed the gap; this lesson is about the number professionals extract from it.
The ceiling in court
Colorado permits changing a right’s use, place or timing — but never expanding it. The measure of what may transfer is the right’s historical consumptive use: what it actually, beneficially consumed over a representative period. Diverted is not consumed — the unconsumed share went back as return flows that neighbors now depend on, so an HCU analysis credits only consumption, and the return-flow pattern must be maintained. This is the most litigated number in Colorado water because the entire price of a transaction rides on it.
The sentence that matters, then, has this shape: “This 3.5 cfs 1889 right diverted a median 412 AF/yr over the last two decades, was in priority 71% of the irrigation season, and its use trend is flat.” — observed behavior, not decreed possibility.
AGRICULTURAL DITCH’s observed behavior
Over a record running 2011–2025 (15 recorded years), its recent-decade average diversion is 8,251 AF/yr against a record peak of 10,593 AF. Set against its decreed 539.6 cfs run for a full season (195,857 AF), that is 4% utilization — the screen-level version of the number an engineer would refine. Its recorded-use trend over the recent record reads increasing.
Every year, ranked against its own record: the dossier.
See it on a real structure
Pick a structure and see its observed behavior, screen-level.
What this does not let you conclude
These are diversion-based screens: a real HCU analysis subtracts return flows, chooses a representative period defensibly, handles enlargement and non-use questions, and survives opposing counsel — engineering work this page points at and does not do. Advisory reading aid on public data — never an administrative or legal conclusion, and never a substitute for DWR administration or an engineer’s analysis. Our methodology has not yet had outside expert review: how this is built.