← My Water  ·  Print / save as PDF

GEARY CREEK

Structure dossier · WDID 0110211 · WF · DWR record

Where this page's figures come from

Generated 2026-08-29 04:15 by Hydrohistorian. Sources: DWR HydroBase snapshot HydroBase_CO_20260707 (history) + CDSS REST (current), USGS NWIS cross-checks. Engine v0.5.0 (69085a9) — every figure regenerates from this named code version and data image.

In short

GEARY CREEK holds 1 decreed right. We cannot judge whether its rights are in priority: this structure is not on the modelled flow network, so no reference gage can honestly stand in for it. It was a party to 1 court cases that also touched 4 other structures.

Assembled from the figures on this page — every number above is checked against them before it is shown (3 checked). The detail, with its method, is in the cards below.

Download this structure

Everything on this page as data you can work with — and a README that makes it citable: the HydroBase snapshot it was built from, the build commit, what every column means, the method behind each derived figure, and that method's stated limits.

⇩ Full record (.zip) Print / save as PDF

Or one table at a time: rights.csv · annual_use.csv · curtailment_now.csv · court_cases.csv · co_parties.csv · call_climatology.csv

What is in the bundle
  • rights.csv — every decreed right, most senior first, with admin numbers, dates, amounts, uses and case numbers.
  • annual_use.csv — recorded diversion by year, with releases accounted separately.
  • curtailment_now.csv — each right's current priority status and how often it was out across analog years.
  • court_cases.csv — the cases attached to its rights.
  • co_parties.csv — the other structures that were parties to those cases. Not available anywhere else.
  • call_climatology.csv — how often each right has been out of priority by week of season, with confidence intervals and the seasons the record could actually judge.
  • README.txt — provenance, methods, limits, disclaimer, and links back to DWR's own records for verification.

Where it sits

Location as DWR records it (other). Faint dots are the neighbouring water; click any to open it.

Which of its rights are out of priority?

Not computable for this structure: this structure is not on the modelled flow network, so no reference gage can honestly stand in for it.

Where it sits in line

Priority 2006-11-305100th most senior of the 7705 structures with decreed rights in this water districtDWR's administrative subdivision of a river basin; the unit calls are usually stated in..

Under prior appropriationColorado's rule for sharing water: first in time, first in right. Age decides, not proximity or need., everything ahead of it in this line is satisfied in full before it receives any water. Immediately ahead: EMPIRE (OUTLET EMBANKMENT) (2006-11-30). Immediately behind: GIBSON #1 (2006-11-30).

Decreed rights (1)

Admin noDWR's numeric encoding of a water right's seniority. Smaller is more senior; the integer part counts days from 1849-12-31 to the date that ranks the right. AppropriatedWhen water was first put to beneficial use. It sets seniority unless a prior adjudication date is later. AdjudicatedWhen the water court confirmed the right. A use decreed in 1975 was not a decreed use in 1955, however old the appropriation is. AbsoluteA right actually put to use, as opposed to conditional -- a placeholder for a use not yet made. ConditionalA right reserving a place in line for a use not yet made; it must be diligently pursued or it lapses. Decreed forWhat the court said this water may be used for -- irrigation, municipal supply, augmentation and so on.Case
57312.00000 2006-11-302006-12-31 13.3 A 0.0 Irrigation, Commercial +5

How good is our record of it?

Grade C (5/10 points) — the components below are the finding; the letter alone is not.

The rubric, component by component
CheckStateDetail
identity partial missing water source
decreed rights on file 1 right(s), seniority decoded
diversion record absent no diversion records cached
record continuity unknown no record span to measure against
published-record stability stable no upstream revisions recorded against this structure

Advisory reading aid on public data — not an administrative or legal conclusion, not a title opinion, and not a substitute for DWR administration or an engineer's analysis. Methodology review status is disclosed at hydrohistorian's basin pages.