← My Water  ·  Print / save as PDF

0205094

Structure dossier · WDID 0205094 · DWR record

Where this page's figures come from

Generated 2026-08-28 09:25 by Hydrohistorian. Sources: DWR HydroBase snapshot HydroBase_CO_20260707 (history) + CDSS REST (current), USGS NWIS cross-checks. Engine v0.5.0 (0576005) — every figure regenerates from this named code version and data image.

Current administration

● Fully called out — call at LOWER LATHAM DITCH (SOUTH PLATTE RIVER, priority 1877-11-14).

● Fully called out — call at WESTERN MUTUAL DITCH (SOUTH PLATTE RIVER, priority 1871-08-09).

Which of its rights are out of priority?

Not computable for this structure: this structure is not on the modelled flow network, so no reference gage can honestly stand in for it.

Where it sits in line

Priority 1976-05-067511th most senior of the 21881 structures with decreed rights in this water districtDWR's administrative subdivision of a river basin; the unit calls are usually stated in..

Under prior appropriationColorado's rule for sharing water: first in time, first in right. Age decides, not proximity or need., everything ahead of it in this line is satisfied in full before it receives any water. Immediately ahead: 0205093 (1976-05-06). Immediately behind: 0205095 (1976-05-06).

Decreed rights (1)

Admin noDWR's numeric encoding of a water right's seniority. Smaller is more senior; the integer part counts days from 1849-12-31 to the date that ranks the right. AppropriatedWhen water was first put to beneficial use. It sets seniority unless a prior adjudication date is later. AdjudicatedWhen the water court confirmed the right. A use decreed in 1975 was not a decreed use in 1955, however old the appropriation is. AbsoluteA right actually put to use, as opposed to conditional -- a placeholder for a use not yet made. ConditionalA right reserving a place in line for a use not yet made; it must be diligently pursued or it lapses. UnitsUsesWhat the court said this water may be used for -- irrigation, municipal supply, augmentation and so on.Case
46147.01976-05-061976-12-31 56.00.0 AIRRMUNINDDOMOTH

How often is it out of priority?

Across the 9 seasons whose call record is complete enough to judge this structure (2017, 2018, 2020, 2021, 2022, 2023, 2024, 2025, 2026), week by week from April. Read these as counts, not rates — 9 seasons is a short record.

most senior right · admin 46147.00000 · peaks at 8 of 9 seasons
AprMayJunJulAugSep
Why only 9 seasons, and what the bars mean

Each bar is one week: how many of those seasons that right was out of priority under a call this site can lawfully attribute to this structure. Green is never, red is every season on record.

The short record is a property of DWR's data, not of the river. A call only counts against a structure when we can establish it applies — by the districts named in its set comments, or by stream mile on the same source. DWR did not begin stating affected districts routinely until about 2015: fewer than one call in ten can be judged before then, against roughly two in three since. A season we cannot judge is not a season without calls, so it is dropped rather than counted as quiet — 14 seasons dropped here.

This is a frequency over past seasons, not a forecast. It says nothing about what the division engineer will do this year.

How good is our record of it?

Grade C (5/10 points) — the components below are the finding; the letter alone is not.

The rubric, component by component
CheckStateDetail
identity partial missing name, structure type, water source
decreed rights on file 1 right(s), seniority decoded
diversion record absent no diversion records cached
record continuity unknown no record span to measure against
published-record stability stable no upstream revisions recorded against this structure

Advisory reading aid on public data — not an administrative or legal conclusion, not a title opinion, and not a substitute for DWR administration or an engineer's analysis. Methodology review status is disclosed at hydrohistorian's basin pages.