← My Water  ·  Print / save as PDF

RICH WELL 8-19495

Structure dossier · WDID 0807378 · WELL · GROUNDWATER: SOUTH PLATTE RIVER · DWR record

Where this page's figures come from

Generated 2026-08-27 21:01 by Hydrohistorian. Sources: DWR HydroBase snapshot HydroBase_CO_20260707 (history) + CDSS REST (current), USGS NWIS cross-checks. Engine v0.5.0 (0576005) — every figure regenerates from this named code version and data image.

Where it sits

Location as DWR records it. Faint dots are the neighbouring water; click any to open it.

Current administration

● Junior rights called out — call at CANAL 3 DITCH (CACHE LA POUDRE RIVER, priority 1870-04-01).

● Fully called out — call at BIG T PLATTE R DITCH (BIG THOMPSON RIVER, priority 1865-11-18).

● Fully called out — call at B H EATON DITCH (CACHE LA POUDRE RIVER, priority 1864-06-09).

● Fully called out — call at LAST CHANCE DITCH 2 (SOUTH PLATTE RIVER, priority 1863-12-30).

● Fully called out — call at NEVADA DITCH (SOUTH PLATTE RIVER, priority 1865-12-30).

Which of its rights are out of priority?

Not computable for this structure: this structure is not on the modelled flow network, so no reference gage can honestly stand in for it.

Where it sits in line

Priority 1869-07-30297th most senior of the 21881 structures with decreed rights in this water districtDWR's administrative subdivision of a river basin; the unit calls are usually stated in..

Under prior appropriationColorado's rule for sharing water: first in time, first in right. Age decides, not proximity or need., everything ahead of it in this line is satisfied in full before it receives any water. Immediately ahead: 0807377 (1869-07-30). Immediately behind: 0808050 (1869-07-30).

Decreed rights (15)

Admin noDWR's numeric encoding of a water right's seniority. Smaller is more senior; the integer part counts days from 1849-12-31 to the date that ranks the right. AppropriatedWhen water was first put to beneficial use. It sets seniority unless a prior adjudication date is later. AdjudicatedWhen the water court confirmed the right. A use decreed in 1975 was not a decreed use in 1955, however old the appropriation is. AbsoluteA right actually put to use, as opposed to conditional -- a placeholder for a use not yet made. ConditionalA right reserving a place in line for a use not yet made; it must be diligently pursued or it lapses. UnitsUsesWhat the court said this water may be used for -- irrigation, municipal supply, augmentation and so on.Case
7151.01869-07-301883-12-10 0.00.0 AIRRMUNCOMINDRECFIRDOMAUG
7151.01869-07-301883-12-10 0.00.0 CIRRMUNCOMINDRECFIRDOMAUG
8947.01874-06-301883-12-10 0.00.0 AMUN
8947.01874-06-301883-12-10 0.00.0 CMUN
9190.01875-02-281883-12-10 0.00.0 AMUN
9190.01875-02-281883-12-10 0.00.0 CMUN
9312.01875-06-301883-12-10 0.00.0 AMUN
9312.01875-06-301883-12-10 0.00.0 CMUN
11016.01880-02-281883-12-10 0.00.0 CIRRMUNCOMINDRECFIRDOMAUG
37736.01953-04-261971-12-31 190.00.0 AIRRMUN
37736.01953-04-261971-12-31 2.780.0 CIRRMUN
40714.01961-06-211961-12-31 0.00.0 AMUN
40714.01961-06-211961-12-31 0.00.0 CMUN
50038.01986-12-311986-12-31 0.01823.0 AIRRMUNCOMINDRECFIRDOMSTKAUG
50038.01986-12-311986-12-31 0.02.78 CIRRMUNCOMINDRECFIRDOMSTKAUG

Advisory reading aid on public data — not an administrative or legal conclusion, not a title opinion, and not a substitute for DWR administration or an engineer's analysis. Methodology review status is disclosed at hydrohistorian's basin pages.