← My Water  ·  Print / save as PDF

PARKER W&SD NNT DEN WL FLD

Structure dossier · WDID 0816005 · WELL FIELD · GROUNDWATER: DENVER · DWR record

Where this page's figures come from

Generated 2026-08-27 20:59 by Hydrohistorian. Sources: DWR HydroBase snapshot HydroBase_CO_20260707 (history) + CDSS REST (current), USGS NWIS cross-checks. Engine v0.5.0 (0576005) — every figure regenerates from this named code version and data image.

Where it sits

Location as DWR records it. Faint dots are the neighbouring water; click any to open it.

Current administration

● Junior rights called out — call at LITTLETON BOAT CHUTE NO 10 (SOUTH PLATTE RIVER, priority 1994-12-02).

● Fully called out — call at CANAL 3 DITCH (CACHE LA POUDRE RIVER, priority 1870-04-01).

● Fully called out — call at BIG T PLATTE R DITCH (BIG THOMPSON RIVER, priority 1865-11-18).

● Fully called out — call at B H EATON DITCH (CACHE LA POUDRE RIVER, priority 1864-06-09).

● Fully called out — call at LAST CHANCE DITCH 2 (SOUTH PLATTE RIVER, priority 1863-12-30).

Which of its rights are out of priority?

Not computable for this structure: this structure is not on the modelled flow network, so no reference gage can honestly stand in for it.

Where it sits in line

Priority 1972-03-276848th most senior of the 21881 structures with decreed rights in this water districtDWR's administrative subdivision of a river basin; the unit calls are usually stated in..

Under prior appropriationColorado's rule for sharing water: first in time, first in right. Age decides, not proximity or need., everything ahead of it in this line is satisfied in full before it receives any water. Immediately ahead: 0816002 (1972-03-27). Immediately behind: 2305597 (1972-03-27).

Decreed rights (9)

Admin noDWR's numeric encoding of a water right's seniority. Smaller is more senior; the integer part counts days from 1849-12-31 to the date that ranks the right. AppropriatedWhen water was first put to beneficial use. It sets seniority unless a prior adjudication date is later. AdjudicatedWhen the water court confirmed the right. A use decreed in 1975 was not a decreed use in 1955, however old the appropriation is. AbsoluteA right actually put to use, as opposed to conditional -- a placeholder for a use not yet made. ConditionalA right reserving a place in line for a use not yet made; it must be diligently pursued or it lapses. UnitsUsesWhat the court said this water may be used for -- irrigation, municipal supply, augmentation and so on.Case
44646.01972-03-271978-12-31 12.30.0 AMUNOTH
49277.01984-11-301984-12-31 1658.00.0 AIRRMUNCOMINDRECFISFIRDOMSTKAUG
50187.01987-05-291987-12-31 1025.50.0 AIRRMUNCOMINDRECFISFIRDOMSTKOTH
52770.01994-06-241994-12-31 276.00.0 AALL
53078.01995-04-281995-12-31 377.90.0 AMUNALL
53111.01995-05-311995-12-31 532.00.0 AALL
54334.01998-10-051998-12-31 30.90.0 AIRRMUNCOMINDRECFISFIRDOMSTKAUG
54433.01999-01-121999-12-31 14.00.0 AIRRMUNCOMINDRECFISFIRDOMSTKAUG
57190.02006-07-312006-12-31 73.30.0 AIRRMUNCOMINDRECFISDOMSTKAUGWLD

Advisory reading aid on public data — not an administrative or legal conclusion, not a title opinion, and not a substitute for DWR administration or an engineer's analysis. Methodology review status is disclosed at hydrohistorian's basin pages.