← My Water  ·  Print / save as PDF

MILL DITCH

Structure dossier · WDID 1300954 · 1 · TEXAS CREEK · DWR record

Where this page's figures come from

Generated 2026-08-28 04:35 by Hydrohistorian. Sources: DWR HydroBase snapshot HydroBase_CO_20260707 (history) + CDSS REST (current), USGS NWIS cross-checks. Engine v0.5.0 (2deb1d7) — every figure regenerates from this named code version and data image.

Where it sits

Location as DWR records it. Faint dots are the neighbouring water; click any to open it.

Which of its rights are out of priority?

Not computable for this structure: this structure is not on the modelled flow network, so no reference gage can honestly stand in for it.

Where it sits in line

Priority 1871-09-0154th most senior of the 1017 structures with decreed rights in this water districtDWR's administrative subdivision of a river basin; the unit calls are usually stated in..

Under prior appropriationColorado's rule for sharing water: first in time, first in right. Age decides, not proximity or need., everything ahead of it in this line is satisfied in full before it receives any water. Immediately ahead: WM CONRADTS DITCH NO 2 (1871-09-01). Immediately behind: DARMAN DITCH (1872-04-08).

Decreed rights (1)

Admin noDWR's numeric encoding of a water right's seniority. Smaller is more senior; the integer part counts days from 1849-12-31 to the date that ranks the right. AppropriatedWhen water was first put to beneficial use. It sets seniority unless a prior adjudication date is later. AdjudicatedWhen the water court confirmed the right. A use decreed in 1975 was not a decreed use in 1955, however old the appropriation is. AbsoluteA right actually put to use, as opposed to conditional -- a placeholder for a use not yet made. ConditionalA right reserving a place in line for a use not yet made; it must be diligently pursued or it lapses. UnitsUsesWhat the court said this water may be used for -- irrigation, municipal supply, augmentation and so on.Case
7914.01871-09-011894-02-03 1.00.0 CIRRAUG 6

Recorded use (last 15 years on record)

In a median year this structure has a recorded diversion of 296 AF. Its most recent year on record, 2024, came in at 94 AF — 32% of that, and 1st lowest of the 15 years with a recorded volume.

This structure records both diversions and reservoir releases — they are separate water movements and are accounted separately below.

YearDiverted (AFA volume: one acre covered a foot deep, about 326,000 gallons -- roughly a suburban household's outdoor use for a year.)Compared with its own recordReleased (AF)Days recordedPeak (cfs)
2010 153 2nd lowest of 15 · 52% of median 52 80 1.0
2011 394 15th lowest of 15 · 133% of median 200 1.2
2012 297 9th lowest of 15 · 100% of median 203 1.0
2013 352 13th lowest of 15 · 119% of median 201 1.0
2014 296 8th lowest of 15 · 100% of median 190 1.0
2015 361 14th lowest of 15 · 122% of median 166 1.5
2016 306 11th lowest of 15 · 103% of median 201 1.0
2017 319 12th lowest of 15 · 108% of median 170 1.0
2018 298 10th lowest of 15 · 101% of median 196 1.0
2019 281 7th lowest of 15 · 95% of median 174 1.1
2020 220 5th lowest of 15 · 74% of median 161 1.0
2021 153 2nd lowest of 15 · 52% of median 94 0.9
2022 214 4th lowest of 15 · 72% of median 130 0.9
2023 231 6th lowest of 15 · 78% of median 183 0.9
2024 94 1st lowest of 15 · 32% of median 69 0.8

How good is our record of it?

Grade B (7/10 points) — the components below are the finding; the letter alone is not.

The rubric, component by component
CheckStateDetail
identity complete name, type, and water source all on file
decreed rights on file 1 right(s), seniority decoded
diversion record present 8361 measured days; currency unknown (no data-coverage date to compare against)
record continuity sparse 36% of the irrigation seasons in 1917-2024 carry measured days
published-record stability stable no upstream revisions recorded against this structure

Advisory reading aid on public data — not an administrative or legal conclusion, not a title opinion, and not a substitute for DWR administration or an engineer's analysis. Methodology review status is disclosed at hydrohistorian's basin pages.