← My Water  ·  Print / save as PDF

TEMPLETON DITCH

Structure dossier · WDID 6000776 · 1 · TABEGUACHE CREEK · DWR record

Where this page's figures come from

Generated 2026-08-28 00:57 by Hydrohistorian. Sources: DWR HydroBase snapshot HydroBase_CO_20260707 (history) + CDSS REST (current), USGS NWIS cross-checks. Engine v0.5.0 (2deb1d7) — every figure regenerates from this named code version and data image.

Where it sits

Location as DWR records it. Faint dots are the neighbouring water; click any to open it.

Which of its rights are out of priority?

Not computable for this structure: this structure is not on the modelled flow network, so no reference gage can honestly stand in for it.

Where it sits in line

Priority 1911-11-25828th most senior of the 2893 structures with decreed rights in this water districtDWR's administrative subdivision of a river basin; the unit calls are usually stated in..

Under prior appropriationColorado's rule for sharing water: first in time, first in right. Age decides, not proximity or need., everything ahead of it in this line is satisfied in full before it receives any water. Immediately ahead: WILLOW CREEK DITCH NO 3 (1910-06-01). Immediately behind: GUIRE DITCH (1912-04-01).

Decreed rights (4)

Admin noDWR's numeric encoding of a water right's seniority. Smaller is more senior; the integer part counts days from 1849-12-31 to the date that ranks the right. AppropriatedWhen water was first put to beneficial use. It sets seniority unless a prior adjudication date is later. AdjudicatedWhen the water court confirmed the right. A use decreed in 1975 was not a decreed use in 1955, however old the appropriation is. AbsoluteA right actually put to use, as opposed to conditional -- a placeholder for a use not yet made. ConditionalA right reserving a place in line for a use not yet made; it must be diligently pursued or it lapses. UnitsUsesWhat the court said this water may be used for -- irrigation, municipal supply, augmentation and so on.Case
30604.226081911-11-251939-11-01 2.00.0 CIRR 273
31215.01935-06-191939-11-01 1.50.0 CIRR 340
32811.32581939-03-151952-07-10 0.50.0 CIRR 396
36403.01949-09-011952-07-10 1.50.0 CIRR

Recorded use (last 15 years on record)

In a median year this structure has a recorded diversion of 748 AF. Its most recent year on record, 2024, came in at 633 AF — 85% of that, and 5th lowest of the 15 years with a recorded volume.

YearDiverted (AFA volume: one acre covered a foot deep, about 326,000 gallons -- roughly a suburban household's outdoor use for a year.)Compared with its own recordDays recordedPeak (cfs)
2010 730 7th lowest of 15 · 98% of median 145 4.4
2011 748 8th lowest of 15 · 100% of median 168 6.0
2012 499 3rd lowest of 15 · 67% of median 124 2.9
2013 1,005 12th lowest of 15 · 134% of median 105 8.5
2014 764 9th lowest of 15 · 102% of median 98 7.0
2015 1,193 14th lowest of 15 · 160% of median 157 7.5
2016 1,243 15th lowest of 15 · 166% of median 199 7.5
2017 724 6th lowest of 15 · 97% of median 110 7.2
2018 991 11th lowest of 15 · 132% of median 210 3.0
2019 585 4th lowest of 15 · 78% of median 190 4.0
2020 304 1st lowest of 15 · 41% of median 114 2.9
2021 766 10th lowest of 15 · 102% of median 86 7.5
2022 1,185 13th lowest of 15 · 158% of median 183 3.3
2023 395 2nd lowest of 15 · 53% of median 125 3.0
2024 633 5th lowest of 15 · 85% of median 136 2.4

How good is our record of it?

Grade B (8/10 points) — the components below are the finding; the letter alone is not.

The rubric, component by component
CheckStateDetail
identity complete name, type, and water source all on file
decreed rights on file 4 right(s), seniority decoded
diversion record present 6227 measured days; currency unknown (no data-coverage date to compare against)
record continuity patchy 58% of the irrigation seasons in 1974-2024 carry measured days
published-record stability stable no upstream revisions recorded against this structure

Advisory reading aid on public data — not an administrative or legal conclusion, not a title opinion, and not a substitute for DWR administration or an engineer's analysis. Methodology review status is disclosed at hydrohistorian's basin pages.