← My Water · Print / save as PDF
LITTLE D&PMP PLT
Structure dossier · WDID 7300535 · 8 · COATES CREEK · DWR record
Where this page's figures come from
Generated 2026-08-28 00:07 by Hydrohistorian. Sources: DWR HydroBase snapshot HydroBase_CO_20260707 (history) + CDSS REST (current), USGS NWIS cross-checks. Engine v0.5.0 (2deb1d7) — every figure regenerates from this named code version and data image.
Where it sits
Location as DWR records it. Faint dots are the neighbouring water; click any to open it.
Which of its rights are out of priority?
Not computable for this structure: this structure is not on the modelled flow network, so no reference gage can honestly stand in for it.
Where it sits in line
Priority 1927-05-01 — 50th most senior of the 221 structures with decreed rights in this water districtDWR's administrative subdivision of a river basin; the unit calls are usually stated in..
Under prior appropriationColorado's rule for sharing water: first in time, first in right. Age decides, not proximity or need., everything ahead of it in this line is satisfied in full before it receives any water. Immediately ahead: MADDEN TROUT POND NO 1 (1933-09-01). Immediately behind: MUD SPRINGS (1942-07-14).
Decreed rights (3)
| Admin noDWR's numeric encoding of a water right's seniority. Smaller is more senior; the integer part counts days from 1849-12-31 to the date that ranks the right. | AppropriatedWhen water was first put to beneficial use. It sets seniority unless a prior adjudication date is later. | AdjudicatedWhen the water court confirmed the right. A use decreed in 1975 was not a decreed use in 1955, however old the appropriation is. | AbsoluteA right actually put to use, as opposed to conditional -- a placeholder for a use not yet made. | ConditionalA right reserving a place in line for a use not yet made; it must be diligently pursued or it lapses. | Units | UsesWhat the court said this water may be used for -- irrigation, municipal supply, augmentation and so on. | Case |
|---|---|---|---|---|---|---|---|
| 34419.28244 | 1927-05-01 | 1959-07-21 | 0.21 | 0.0 | C | IRR | 683 |
| 38837.0 | 1956-05-01 | 1959-07-21 | 0.76 | 0.0 | C | IRR | 946 |
| 48212.38837 | 1956-05-01 | 1982-12-31 | 1.0 | 0.0 | C | STK |
Legal record & documents
5 decreed actions on record across
4 court cases:
82CW0004, W0335, W0077, CA8303.
Every case, dated
| Case | Actions | Latest adjudication | Types |
|---|---|---|---|
82CW0004 | 1 | 1982-12-31 | S |
W0335 | 1 | 1959-07-21 | S |
W0077 | 1 | 1959-07-21 | S |
CA8303 | 2 | 1959-07-21 | S |
DWR's own records for this structure: net amounts · transactions & adjudication history · scanned decrees (search a case number there for the imaged document). On this site: the district's full legal picture →
Recorded use (last 15 years on record)
In a median year this structure has a recorded diversion of 47 AF. Its most recent year on record, 2025, came in at 0 AF — 0% of that, and 1st lowest of the 15 years with a recorded volume.
| Year | Diverted (AFA volume: one acre covered a foot deep, about 326,000 gallons -- roughly a suburban household's outdoor use for a year.) | Compared with its own record | Days recorded | Peak (cfs) |
|---|---|---|---|---|
| 2011 | 0 | 1st lowest of 15 · 0% of median | 8 | 0.0 |
| 2012 | 0 | 1st lowest of 15 · 0% of median | 6 | 0.0 |
| 2013 | 0 | 1st lowest of 15 · 0% of median | 15 | 0.0 |
| 2014 | 110 | 15th lowest of 15 · 234% of median | 93 | 1.2 |
| 2015 | 71 | 10th lowest of 15 · 151% of median | 101 | 0.7 |
| 2016 | 72 | 11th lowest of 15 · 153% of median | 81 | 0.9 |
| 2017 | 38 | 6th lowest of 15 · 81% of median | 67 | 0.4 |
| 2018 | 20 | 5th lowest of 15 · 43% of median | 44 | 0.4 |
| 2019 | 84 | 12th lowest of 15 · 179% of median | 59 | 1.1 |
| 2020 | 56 | 9th lowest of 15 · 119% of median | 48 | 0.8 |
| 2021 | 43 | 7th lowest of 15 · 92% of median | 68 | 0.4 |
| 2022 | 108 | 14th lowest of 15 · 230% of median | 82 | 0.7 |
| 2023 | 84 | 12th lowest of 15 · 179% of median | 61 | 0.7 |
| 2024 | 47 | 8th lowest of 15 · 100% of median | 53 | 0.7 |
| 2025 | 0 | 1st lowest of 15 · 0% of median | 1 | 0.0 |
Trends for this structure
Recorded use shows no clear trend over its last 15 recorded years — which is itself worth knowing.
How good is our record of it?
Grade B (7/10 points) — the components below are the finding; the letter alone is not.
The rubric, component by component
| Check | State | Detail |
|---|---|---|
| identity | complete | name, type, and water source all on file |
| decreed rights | on file | 3 right(s), seniority decoded |
| diversion record | present | 1259 measured days; currency unknown (no data-coverage date to compare against) |
| record continuity | sparse | 12% of the irrigation seasons in 1975-2025 carry measured days |
| published-record stability | stable | no upstream revisions recorded against this structure |
Advisory reading aid on public data — not an administrative or legal conclusion, not a title opinion, and not a substitute for DWR administration or an engineer's analysis. Methodology review status is disclosed at hydrohistorian's basin pages.