Uncompahgre Project - Gunnison Tunnel - Finished section of Interior - Colorado
National Archives, via Wikimedia Commons · circa 1903-1909 · U.S. Reclamation Service (photographer not recorded)
National Archives, Records of the Bureau of Reclamation (Record Group 115), National Archives Identifier 294722; via Wikimedia Commons Public domain. Archive record ↗ · Rights
Source Archival record · verify at National Archives, via Wikimedia Commons ↗
Inside the Gunnison Tunnel before water: a finished, concrete-lined reach with the construction railway still on the floor. The tunnel carries the Gunnison River under Vernal Mesa to the Uncompahgre Valley.
Shows: The lining and bore of the tunnel as built, and the scale of the work.
What this does not let you conclude: Flow -- the tunnel is dry here; the gage record beside it shows what it delivers. The National Archives dates the album circa 1903; the tunnel was completed in 1909.
Placed on
- Division 4 · hero
- Topic transbasin · gallery