← My Water  ·  Print / save as PDF  · 

 ·  every download of this record carries its certificate id

BIJOU AUG PLAN

Structure dossier · WDID 0103339 · AUGMENTATION/REPLACEMENT PLAN · DWR record

Bijou Aug Plan is a water structure in Colorado. This page is its public record: the water it has a right to, whether it may take it today, and its history, compiled from the Colorado Division of Water Resources.

Source DWR administrative record · verify at DWR structure ↗ Source DWR administrative record · verify at DWR diversion records ↗ Source Our computation, scored against a reference · scored against DWR's call analysis, see /methods

Where this page's figures come from

Generated 2026-10-14 02:43 by Hydrohistorian. Sources: DWR HydroBase snapshot HydroBase_CO_20260928 (history) + CDSS REST (current), USGS NWIS cross-checks. Engine v0.5.0 (dd58e60) — every figure regenerates from this named code version and data image.

Download this structure

Everything on this page as data you can work with — and a README that makes it citable: the HydroBase snapshot it was built from, the build commit, what every column means, the method behind each derived figure, and that method's stated limits.

⇩ Full record (.zip) Print / save as PDF

Or one table at a time: rights.csv · annual_use.csv · curtailment_now.csv · court_cases.csv · co_parties.csv · call_climatology.csv

What is in the bundle
  • rights.csv — every decreed right, most senior first, with admin numbers, dates, amounts, uses and case numbers.
  • annual_use.csv — recorded diversion by year, with releases accounted separately.
  • curtailment_now.csv — each right's current priority status and how often it was out across analog years.
  • court_cases.csv — the cases attached to its rights.
  • co_parties.csv — the other structures that were parties to those cases. Not available anywhere else.
  • call_climatology.csv — how often each right has been out of priority by week of season, with confidence intervals and the seasons the record could actually judge.
  • README.txt — provenance, methods, limits, disclaimer, and links back to DWR's own records for verification.

Where it sits

Location as DWR records it (administrative). Faint dots are the neighbouring water; click any to open it.

Which of its rights are out of priority?

The outlook for the weeks ahead is not computable for this structure: no decreed right on file, so there is no priority to test.

Substitute water supply plan

This structure is named on 1 active substitute water supply plan with the State Engineer (37-92-308 / 37-90-137). A structure operating under an approved SWSP may divert out of priority within the plan's terms — read any curtailment screen on this page alongside it.

PlanTypeStatusExpiresCaseDocuments
BIJOU IRRIGATION COMPANY EMERGENCY 37-92-308(5) PLANS LESS THAN 5 YEARS Approved 2027-05-31 — plan file (DWR)

Source: DWR’s active-SWSP register (state open-data portal), refreshed nightly. Approval terms live in the linked plan file; this page does not interpret them.

Recorded use (last 15 years on record)

Years far under the decreed amount? That gap has a name — paper water vs. wet water, explained on this structure.

This structure records both diversions and reservoir releases — they are separate water movements and are accounted separately below.

YearDiverted (AFA volume: one acre covered a foot deep, about 326,000 gallons -- roughly a suburban household's outdoor use for a year.)Compared with its own recordReleased (AF)Days recordedPeak (cfs)
1989 — no recorded volume 319 0 —
1990 — no recorded volume 2,722 0 —
1991 — no recorded volume 2,174 0 —
1992 — no recorded volume 2,961 0 —
1993 — no recorded volume 2,417 0 —
1994 — no recorded volume 430 0 —
1995 — no recorded volume 1,320 0 —
1996 — no recorded volume 299 0 —
1997 — no recorded volume 460 0 —
1998 — no recorded volume 267 0 —
1999 — no recorded volume 159 0 —
2000 — no recorded volume 3,253 0 —
2001 — no recorded volume 9,607 0 —
2002 — no recorded volume 8,091 0 —
2003 — no recorded volume 5,247 0 —

How good is our record of it?

Grade C (4/10 points) — the components below are the finding; the letter alone is not.

The rubric, component by component
CheckStateDetail
identity partial missing water source
decreed rights absent no water rights cached for this WDID
diversion record fragment 85 measured day(s) on file (under 180 -- a season, not a history)
record continuity unknown record too short to assess continuity (needs 2+ years of span and 180+ measured days)
published-record stability stable no upstream revisions recorded against this structure

Advisory reading aid on public data — not an administrative or legal conclusion, not a title opinion, and not a substitute for DWR administration or an engineer's analysis. Methodology review status is disclosed at hydrohistorian's basin pages.

Hydrohistorian is free, with no ads — one server and a lot of public records. If it earns its keep, you can help keep it running.