← My Water  ·  All wells in this district  ·  Print / save as PDF  · 

 ·  every download of this record carries its certificate id

GIRL SCOUTS W 3-47774

Structure dossier · WDID 0307165 · WELL · CACHE LA POUDRE RIVER · DWR record

Source DWR administrative record · verify at DWR structure ↗ Source DWR administrative record · verify at DWR diversion records ↗ Source Our computation, scored against a reference · scored against DWR's call analysis, see /methods

Where this page's figures come from

Generated 2026-10-12 17:56 by Hydrohistorian. Sources: DWR HydroBase snapshot HydroBase_CO_20260928 (history) + CDSS REST (current), USGS NWIS cross-checks. Engine v0.5.0 (dd58e60) — every figure regenerates from this named code version and data image.

The record and the river

Well permit on file (1)

DWR ties this well permit to WDID 0307165. A permit is the authorization to construct and use the well — not a water right, and separate from the decrees on this page (three things called “well”).

PermitUse StatusDepthStatic level YieldCompleted
47774- Domestic Well Abandoned 6 ft — — —

Download this structure

Everything on this page as data you can work with — and a README that makes it citable: the HydroBase snapshot it was built from, the build commit, what every column means, the method behind each derived figure, and that method's stated limits.

⇩ Full record (.zip) Print / save as PDF

Or one table at a time: rights.csv · annual_use.csv · curtailment_now.csv · court_cases.csv · co_parties.csv · call_climatology.csv

What is in the bundle
  • rights.csv — every decreed right, most senior first, with admin numbers, dates, amounts, uses and case numbers.
  • annual_use.csv — recorded diversion by year, with releases accounted separately.
  • curtailment_now.csv — each right's current priority status and how often it was out across analog years.
  • court_cases.csv — the cases attached to its rights.
  • co_parties.csv — the other structures that were parties to those cases. Not available anywhere else.
  • call_climatology.csv — how often each right has been out of priority by week of season, with confidence intervals and the seasons the record could actually judge.
  • README.txt — provenance, methods, limits, disclaimer, and links back to DWR's own records for verification.

Where it sits

Location as DWR records it (well). Faint dots are the neighbouring water; click any to open it.

Current administration

● Fully called out — call at CANAL 3 DITCH (CACHE LA POUDRE RIVER, priority 1870-04-01).

● Fully called out — call at OGILVY DITCH (CACHE LA POUDRE RIVER, priority 1884-04-10).

● Fully called out — call at B H EATON DITCH (CACHE LA POUDRE RIVER, priority 1864-04-01).

Which of its rights are out of priority?

The outlook for the weeks ahead is not computable for this structure: this structure is not on the modelled flow network, so no reference gage can honestly stand in for it. Today’s position is a separate question, and it is answered in Current administration above — that screen reads the district’s active calls and needs no reference gage.

Where it sits in line

Priority 1962-03-31 — 1623rd most senior of the 2964 structures with decreed rights in this water districtDWR's administrative subdivision of a river basin; the unit calls are usually stated in..

Under prior appropriationColorado's rule for sharing water: first in time, first in right. Age decides, not proximity or need., everything ahead of it in this line is satisfied in full before it receives any water. Immediately ahead: GIRL SCOUTS LTL HOUSE WL 51353 (1962-03-31). Immediately behind: FLATIRON PAV WELL 23 (1962-04-06).

Decreed rights (2)

Admin noDWR's numeric encoding of a water right's seniority. Smaller is more senior; the integer part counts days from 1849-12-31 to the date that ranks the right. AppropriatedWhen water was first put to beneficial use. It sets seniority unless a prior adjudication date is later. AdjudicatedWhen the water court confirmed the right. A use decreed in 1975 was not a decreed use in 1955, however old the appropriation is. AbsoluteA right actually put to use, as opposed to conditional -- a placeholder for a use not yet made. ConditionalA right reserving a place in line for a use not yet made; it must be diligently pursued or it lapses. Alt-pointAn absolute amount decreed at another structure that may be diverted here instead -- an alternate point of diversion or an exchange. DWR calls this the APEX amount; a right showing 0.0 absolute but an alt-point amount is exercised here under another structure's decree. Decreed forWhat the court said this water may be used for -- irrigation, municipal supply, augmentation and so on.Case
40997.00000 1962-03-311971-12-31 0.0 cfs 0.0 0.0178 cfs Domestic 99CW0074
41911.00000 1964-09-301971-12-31 0.0078 cfs 0.0 — Municipal, Domestic W1366

Amounts marked cfs are flow rates; AF are stored volumes (storage rights are decreed in acre-feet). An absolute amount of 0.0 beside an alt-point amount is not a dead right: the water is decreed at another structure, and that row records permission to divert it here instead (an alternate point or exchange). A case listing several numbers reflects the original decree plus later change cases.

How much of this decree was in priority, by day

A right is in priority on a day when it is senior to every call administering this structure. Of its 0.008 cfs decreed rate, the average day over the last 6 year(s) had 0.008 cfs in priority (100% of the decree). No call in effect is a free river — that was 100.0% of days.

Calls are set and released at a time of day, not at midnight, so a day is counted by the hour: a call setting at 4pm costs that day a third of its rate, not all of it.

This is paper water. It is the decreed rate that was in priority — not water that was physically in the stream, and not water this structure diverted. A ditch can be in priority for 50 cfs on a day the creek carries five. What that distinction means →

YearMean in priority (Apr–Sep) Share of decreeFree-river days Days fully out
2026 0.01 cfs 100% 284 0
2025 0.01 cfs 100% 365 0
2024 0.01 cfs 100% 366 0
2023 0.01 cfs 100% 365 0
2022 0.01 cfs 100% 365 0
2021 0.01 cfs 100% 81 0
Show the last 120 days, day by day
DateIn priorityControlling call
2026-10-11 0.008 cfs (100%) free river — no call
2026-10-10 0.008 cfs (100%) free river — no call
2026-10-09 0.008 cfs (100%) free river — no call
2026-10-08 0.008 cfs (100%) free river — no call
2026-10-07 0.008 cfs (100%) free river — no call
2026-10-06 0.008 cfs (100%) free river — no call
2026-10-05 0.008 cfs (100%) free river — no call
2026-10-04 0.008 cfs (100%) free river — no call
2026-10-03 0.008 cfs (100%) free river — no call
2026-10-02 0.008 cfs (100%) free river — no call
2026-10-01 0.008 cfs (100%) free river — no call
2026-09-30 0.008 cfs (100%) free river — no call
2026-09-29 0.008 cfs (100%) free river — no call
2026-09-28 0.008 cfs (100%) free river — no call
2026-09-27 0.008 cfs (100%) free river — no call
2026-09-26 0.008 cfs (100%) free river — no call
2026-09-25 0.008 cfs (100%) free river — no call
2026-09-24 0.008 cfs (100%) free river — no call
2026-09-23 0.008 cfs (100%) free river — no call
2026-09-22 0.008 cfs (100%) free river — no call
2026-09-21 0.008 cfs (100%) free river — no call
2026-09-20 0.008 cfs (100%) free river — no call
2026-09-19 0.008 cfs (100%) free river — no call
2026-09-18 0.008 cfs (100%) free river — no call
2026-09-17 0.008 cfs (100%) free river — no call
2026-09-16 0.008 cfs (100%) free river — no call
2026-09-15 0.008 cfs (100%) free river — no call
2026-09-14 0.008 cfs (100%) free river — no call
2026-09-13 0.008 cfs (100%) free river — no call
2026-09-12 0.008 cfs (100%) free river — no call
2026-09-11 0.008 cfs (100%) free river — no call
2026-09-10 0.008 cfs (100%) free river — no call
2026-09-09 0.008 cfs (100%) free river — no call
2026-09-08 0.008 cfs (100%) free river — no call
2026-09-07 0.008 cfs (100%) free river — no call
2026-09-06 0.008 cfs (100%) free river — no call
2026-09-05 0.008 cfs (100%) free river — no call
2026-09-04 0.008 cfs (100%) free river — no call
2026-09-03 0.008 cfs (100%) free river — no call
2026-09-02 0.008 cfs (100%) free river — no call
2026-09-01 0.008 cfs (100%) free river — no call
2026-08-31 0.008 cfs (100%) free river — no call
2026-08-30 0.008 cfs (100%) free river — no call
2026-08-29 0.008 cfs (100%) free river — no call
2026-08-28 0.008 cfs (100%) free river — no call
2026-08-27 0.008 cfs (100%) free river — no call
2026-08-26 0.008 cfs (100%) free river — no call
2026-08-25 0.008 cfs (100%) free river — no call
2026-08-24 0.008 cfs (100%) free river — no call
2026-08-23 0.008 cfs (100%) free river — no call
2026-08-22 0.008 cfs (100%) free river — no call
2026-08-21 0.008 cfs (100%) free river — no call
2026-08-20 0.008 cfs (100%) free river — no call
2026-08-19 0.008 cfs (100%) free river — no call
2026-08-18 0.008 cfs (100%) free river — no call
2026-08-17 0.008 cfs (100%) free river — no call
2026-08-16 0.008 cfs (100%) free river — no call
2026-08-15 0.008 cfs (100%) free river — no call
2026-08-14 0.008 cfs (100%) free river — no call
2026-08-13 0.008 cfs (100%) free river — no call
2026-08-12 0.008 cfs (100%) free river — no call
2026-08-11 0.008 cfs (100%) free river — no call
2026-08-10 0.008 cfs (100%) free river — no call
2026-08-09 0.008 cfs (100%) free river — no call
2026-08-08 0.008 cfs (100%) free river — no call
2026-08-07 0.008 cfs (100%) free river — no call
2026-08-06 0.008 cfs (100%) free river — no call
2026-08-05 0.008 cfs (100%) free river — no call
2026-08-04 0.008 cfs (100%) free river — no call
2026-08-03 0.008 cfs (100%) free river — no call
2026-08-02 0.008 cfs (100%) free river — no call
2026-08-01 0.008 cfs (100%) free river — no call
2026-07-31 0.008 cfs (100%) free river — no call
2026-07-30 0.008 cfs (100%) free river — no call
2026-07-29 0.008 cfs (100%) free river — no call
2026-07-28 0.008 cfs (100%) free river — no call
2026-07-27 0.008 cfs (100%) free river — no call
2026-07-26 0.008 cfs (100%) free river — no call
2026-07-25 0.008 cfs (100%) free river — no call
2026-07-24 0.008 cfs (100%) free river — no call
2026-07-23 0.008 cfs (100%) free river — no call
2026-07-22 0.008 cfs (100%) free river — no call
2026-07-21 0.008 cfs (100%) free river — no call
2026-07-20 0.008 cfs (100%) free river — no call
2026-07-19 0.008 cfs (100%) free river — no call
2026-07-18 0.008 cfs (100%) free river — no call
2026-07-17 0.008 cfs (100%) free river — no call
2026-07-16 0.008 cfs (100%) free river — no call
2026-07-15 0.008 cfs (100%) free river — no call
2026-07-14 0.008 cfs (100%) free river — no call
2026-07-13 0.008 cfs (100%) free river — no call
2026-07-12 0.008 cfs (100%) free river — no call
2026-07-11 0.008 cfs (100%) free river — no call
2026-07-10 0.008 cfs (100%) free river — no call
2026-07-09 0.008 cfs (100%) free river — no call
2026-07-08 0.008 cfs (100%) free river — no call
2026-07-07 0.008 cfs (100%) free river — no call
2026-07-06 0.008 cfs (100%) free river — no call
2026-07-05 0.008 cfs (100%) free river — no call
2026-07-04 0.008 cfs (100%) free river — no call
2026-07-03 0.008 cfs (100%) free river — no call
2026-07-02 0.008 cfs (100%) free river — no call
2026-07-01 0.008 cfs (100%) free river — no call
2026-06-30 0.008 cfs (100%) free river — no call
2026-06-29 0.008 cfs (100%) free river — no call
2026-06-28 0.008 cfs (100%) free river — no call
2026-06-27 0.008 cfs (100%) free river — no call
2026-06-26 0.008 cfs (100%) free river — no call
2026-06-25 0.008 cfs (100%) free river — no call
2026-06-24 0.008 cfs (100%) free river — no call
2026-06-23 0.008 cfs (100%) free river — no call
2026-06-22 0.008 cfs (100%) free river — no call
2026-06-21 0.008 cfs (100%) free river — no call
2026-06-20 0.008 cfs (100%) free river — no call
2026-06-19 0.008 cfs (100%) free river — no call
2026-06-18 0.008 cfs (100%) free river — no call
2026-06-17 0.008 cfs (100%) free river — no call
2026-06-16 0.008 cfs (100%) free river — no call
2026-06-15 0.008 cfs (100%) free river — no call
2026-06-14 0.008 cfs (100%) free river — no call
How this is worked out, and what it cannot tell you
  • This is a decreed rate that was in priority -- paper water, not water that was available or diverted.
  • Augmentation plans, exchanges and substitute supply plans let a structure divert lawfully while out of priority; none are modelled.
  • Calls on the river this source flows into are included without a position test, so curtailment can be over-reported where the calling point sits above the confluence.
  • DWR's administration is the authority. Scored against DWR's own call analysis, this method agreed on 95.5% of 85,822 structure-days (2026-08-29).
  • Calls considered for this structure: 0.

How good is our record of it?

Grade C (6/10 points) — the components below are the finding; the letter alone is not.

The rubric, component by component
CheckStateDetail
identity complete name, type, and water source all on file
decreed rights on file 2 right(s), seniority decoded
diversion record absent no diversion records cached
record continuity unknown no record span to measure against
published-record stability stable no upstream revisions recorded against this structure

Advisory reading aid on public data — not an administrative or legal conclusion, not a title opinion, and not a substitute for DWR administration or an engineer's analysis. Methodology review status is disclosed at hydrohistorian's basin pages.

Hydrohistorian is free, with no ads — one server and a lot of public records. If it earns its keep, you can help keep it running.