← My Water  ·  Print / save as PDF

HOLLAND DITCH

Structure dossier · WDID 0500574 · 1 · LEFT HAND CREEK · DWR record

Where this page's figures come from

Generated 2026-08-28 00:37 by Hydrohistorian. Sources: DWR HydroBase snapshot HydroBase_CO_20260707 (history) + CDSS REST (current), USGS NWIS cross-checks. Engine v0.5.0 (2deb1d7) — every figure regenerates from this named code version and data image.

Where it sits

Location as DWR records it. Faint dots are the neighbouring water; click any to open it.

Which of its rights are out of priority?

Not computable for this structure: this structure is not on the modelled flow network, so no reference gage can honestly stand in for it.

Where it sits in line

Priority 1863-05-0163rd most senior of the 1289 structures with decreed rights in this water districtDWR's administrative subdivision of a river basin; the unit calls are usually stated in..

Under prior appropriationColorado's rule for sharing water: first in time, first in right. Age decides, not proximity or need., everything ahead of it in this line is satisfied in full before it receives any water. Immediately ahead: RUNYAN DITCH (1863-05-01). Immediately behind: SOUTH FLAT DITCH (1863-05-15).

Decreed rights (3)

Admin noDWR's numeric encoding of a water right's seniority. Smaller is more senior; the integer part counts days from 1849-12-31 to the date that ranks the right. AppropriatedWhen water was first put to beneficial use. It sets seniority unless a prior adjudication date is later. AdjudicatedWhen the water court confirmed the right. A use decreed in 1975 was not a decreed use in 1955, however old the appropriation is. AbsoluteA right actually put to use, as opposed to conditional -- a placeholder for a use not yet made. ConditionalA right reserving a place in line for a use not yet made; it must be diligently pursued or it lapses. UnitsUsesWhat the court said this water may be used for -- irrigation, municipal supply, augmentation and so on.Case
4869.01863-05-011882-12-02 1.6970.0 CIRRCOMINDRECFISDOMAUGWLD
5965.01866-05-011882-06-02 1.08630.0 CIRRCOMINDRECFISDOMAUGWLD
8695.01873-10-211882-12-02 58.88110.0 CIRRCOMINDRECFISDOMAUGWLD

Recorded use (last 15 years on record)

In a median year this structure has a recorded diversion of 2,203 AF. Its most recent year on record, 2024, came in at 1,832 AF — 83% of that, and 4th lowest of the 15 years with a recorded volume.

YearDiverted (AFA volume: one acre covered a foot deep, about 326,000 gallons -- roughly a suburban household's outdoor use for a year.)Compared with its own recordDays recordedPeak (cfs)
2008 2,134 7th lowest of 15 · 97% of median 169 14.0
2009 2,775 13th lowest of 15 · 126% of median 187 24.8
2010 2,685 11th lowest of 15 · 122% of median 182 20.0
2013 2,753 12th lowest of 15 · 125% of median 124 26.8
2014 3,384 14th lowest of 15 · 154% of median 183 27.4
2015 2,227 9th lowest of 15 · 101% of median 149 36.2
2016 3,641 15th lowest of 15 · 165% of median 168 47.2
2017 2,370 10th lowest of 15 · 108% of median 169 21.9
2018 1,987 6th lowest of 15 · 90% of median 117 25.0
2019 1,733 3rd lowest of 15 · 79% of median 168 15.5
2020 2,203 8th lowest of 15 · 100% of median 157 21.5
2021 1,526 2nd lowest of 15 · 69% of median 159 13.4
2022 1,921 5th lowest of 15 · 87% of median 162 17.0
2023 1,400 1st lowest of 15 · 64% of median 181 11.4
2024 1,832 4th lowest of 15 · 83% of median 184 22.3

Call-derived yield: senior right divertible 100.0% of a median season / 44.4% dry-year.

How good is our record of it?

Grade B (8/10 points) — the components below are the finding; the letter alone is not.

The rubric, component by component
CheckStateDetail
identity complete name, type, and water source all on file
decreed rights on file 3 right(s), seniority decoded
diversion record present 3300 measured days; currency unknown (no data-coverage date to compare against)
record continuity patchy 47% of the irrigation seasons in 1992-2024 carry measured days
published-record stability stable no upstream revisions recorded against this structure

Advisory reading aid on public data — not an administrative or legal conclusion, not a title opinion, and not a substitute for DWR administration or an engineer's analysis. Methodology review status is disclosed at hydrohistorian's basin pages.