← My Water  ·  Print / save as PDF

TUTT DIVERSION DAM

Structure dossier · WDID 1201118 · 1 · GOULD CREEK · DWR record

Where this page's figures come from

Generated 2026-08-27 23:12 by Hydrohistorian. Sources: DWR HydroBase snapshot HydroBase_CO_20260707 (history) + CDSS REST (current), USGS NWIS cross-checks. Engine v0.5.0 (2deb1d7) — every figure regenerates from this named code version and data image.

Where it sits

Location as DWR records it. Faint dots are the neighbouring water; click any to open it.

Which of its rights are out of priority?

Not computable for this structure: this structure is not on the modelled flow network, so no reference gage can honestly stand in for it.

Where it sits in line

Priority 1861-04-1510th most senior of the 1967 structures with decreed rights in this water districtDWR's administrative subdivision of a river basin; the unit calls are usually stated in..

Under prior appropriationColorado's rule for sharing water: first in time, first in right. Age decides, not proximity or need., everything ahead of it in this line is satisfied in full before it receives any water. Immediately ahead: ROSEMONT RES PIPELINE (1861-04-15). Immediately behind: IDEAL CEMENT PUMP PLANT (1861-05-01).

Decreed rights (23)

Admin noDWR's numeric encoding of a water right's seniority. Smaller is more senior; the integer part counts days from 1849-12-31 to the date that ranks the right. AppropriatedWhen water was first put to beneficial use. It sets seniority unless a prior adjudication date is later. AdjudicatedWhen the water court confirmed the right. A use decreed in 1975 was not a decreed use in 1955, however old the appropriation is. AbsoluteA right actually put to use, as opposed to conditional -- a placeholder for a use not yet made. ConditionalA right reserving a place in line for a use not yet made; it must be diligently pursued or it lapses. UnitsUsesWhat the court said this water may be used for -- irrigation, municipal supply, augmentation and so on.Case
4123.01861-04-151894-02-03 0.00.0 CALL 4
4158.01861-05-201894-02-03 0.00.0 CALL 7
5254.01864-05-201894-02-03 0.00.0 CALL 19
5569.01865-03-311894-02-03 0.70.0 CIRR 23
5623.01865-05-241894-02-03 0.00.0 CALL 27
7792.01871-05-021894-02-03 0.00.0 CALL 70
7944.01871-10-011894-02-03 0.70.0 CIRR 76
8024.01871-12-201894-02-03 0.00.0 CALL 19
8037.01872-01-021894-02-03 0.00.0 CALL 20
8403.01873-01-021894-02-03 0.00.0 CALL 107
8432.01873-01-311894-02-03 0.00.0 CALL 109
8552.01873-05-311894-02-03 0.00.0 CALL 122
8825.01874-02-281894-02-03 0.00.0 CALL 132
9236.01875-04-151894-02-03 0.00.0 CALL 151
9499.01876-01-031894-02-03 0.00.0 CALL 162
9632.01876-05-151894-02-03 0.00.0 CALL 171
9648.01876-05-311894-02-03 0.00.0 CALL 172
9970.01877-04-181894-02-03 0.00.0 CALL 184
10348.01878-05-011894-02-03 0.00.0 CALL 198
11382.01881-02-281894-02-03 0.00.0 CALL 245
11396.01881-03-141894-02-03 0.00.0 CALL 246
11707.01882-01-191894-02-03 0.00.0 CALL 262
18411.175111897-12-101901-11-12 6.50.0 CALL 417

How good is our record of it?

Grade C (6/10 points) — the components below are the finding; the letter alone is not.

The rubric, component by component
CheckStateDetail
identity complete name, type, and water source all on file
decreed rights on file 23 right(s), seniority decoded
diversion record absent no diversion records cached
record continuity unknown no record span to measure against
published-record stability stable no upstream revisions recorded against this structure

Advisory reading aid on public data — not an administrative or legal conclusion, not a title opinion, and not a substitute for DWR administration or an engineer's analysis. Methodology review status is disclosed at hydrohistorian's basin pages.