SILVERHEELS RANCH AUG IMPACT REACH
Structure dossier · WDID 2302003 · REACH · SOUTH CROOKED CREEK · DWR record
Where this page's figures come from
Generated 2026-08-27 21:08 by Hydrohistorian. Sources: DWR HydroBase snapshot HydroBase_CO_20260707 (history) + CDSS REST (current), USGS NWIS cross-checks. Engine v0.5.0 (0576005) — every figure regenerates from this named code version and data image.
Where it sits
Location as DWR records it. Faint dots are the neighbouring water; click any to open it.
Current administration
● Fully called out — call at LITTLETON BOAT CHUTE NO 10 (SOUTH PLATTE RIVER, priority 1994-12-02).
● Fully called out — call at CANAL 3 DITCH (CACHE LA POUDRE RIVER, priority 1870-04-01).
● Fully called out — call at BIG T PLATTE R DITCH (BIG THOMPSON RIVER, priority 1865-11-18).
● Fully called out — call at B H EATON DITCH (CACHE LA POUDRE RIVER, priority 1864-06-09).
● Fully called out — call at LAST CHANCE DITCH 2 (SOUTH PLATTE RIVER, priority 1863-12-30).
Which of its rights are out of priority?
Not computable for this structure: this structure is not on the modelled flow network, so no reference gage can honestly stand in for it.
Where it sits in line
Priority 1997-06-11 — 12352nd most senior of the 21881 structures with decreed rights in this water districtDWR's administrative subdivision of a river basin; the unit calls are usually stated in..
Under prior appropriationColorado's rule for sharing water: first in time, first in right. Age decides, not proximity or need., everything ahead of it in this line is satisfied in full before it receives any water. Immediately ahead: 2300688 (1997-06-11). Immediately behind: 0811949 (1997-06-24).
Decreed rights (1)
| Admin noDWR's numeric encoding of a water right's seniority. Smaller is more senior; the integer part counts days from 1849-12-31 to the date that ranks the right. | AppropriatedWhen water was first put to beneficial use. It sets seniority unless a prior adjudication date is later. | AdjudicatedWhen the water court confirmed the right. A use decreed in 1975 was not a decreed use in 1955, however old the appropriation is. | AbsoluteA right actually put to use, as opposed to conditional -- a placeholder for a use not yet made. | ConditionalA right reserving a place in line for a use not yet made; it must be diligently pursued or it lapses. | Units | UsesWhat the court said this water may be used for -- irrigation, municipal supply, augmentation and so on. | Case |
|---|---|---|---|---|---|---|---|
| 53853.0 | 1997-06-11 | 1997-12-31 | 0.0 | 0.0 | C | AUG |
Advisory reading aid on public data — not an administrative or legal conclusion, not a title opinion, and not a substitute for DWR administration or an engineer's analysis. Methodology review status is disclosed at hydrohistorian's basin pages.