← My Water  ·  Print / save as PDF  · 

 ·  every download of this record carries its certificate id

FRY ARK PR CARTER CR CNT

Structure dossier · WDID 3801585 · OTHER · CARTER CREEK · DWR record

Fry Ark Pr Carter Cr Cnt is a water structure on Carter Creek in Colorado. This page is its public record: the water it has a right to, whether it may take it today, and its history, compiled from the Colorado Division of Water Resources.

Source DWR administrative record · verify at DWR structure ↗ Source DWR administrative record · verify at DWR diversion records ↗ Source Our computation, scored against a reference · scored against DWR's call analysis, see /methods

Where this page's figures come from

Generated 2026-10-15 16:04 by Hydrohistorian. Sources: DWR HydroBase snapshot HydroBase_CO_20260928 (history) + CDSS REST (current), USGS NWIS cross-checks. Engine v0.5.0 (dd58e60) — every figure regenerates from this named code version and data image.

The record and the river

Where this structure is measured

GageFlowing nowRecordHow we know
CARTER CREEK FEEDER CANAL NEAR NORRIE, CO. CARFENCO — 1981–1983, 457 days co-located, 43 m

A green link is DWR's own: either its telemetry inventory maps this WDID to that station, or the station is named for this WDID (0700553 → 0700553A). An amber one is ours — the station sits within 250 m and shares a distinctive word with this structure's name, which is a strong hint rather than a DWR statement that this gage meters this structure. Wrong? Tell us.

In short

FRY ARK PR CARTER CR CNT holds 1 decreed right on CARTER CREEK. No active call senior to its rights reaches its district today (28 active calls checked), so it is in priority now. 19 further calls state no district and sit outside this one, so they are counted here rather than assumed either way. That is today's position; the weeks ahead cannot be projected for it: this structure is not on the modelled flow network, so no reference gage can honestly stand in for it. In a median year over its last 12 recorded years it diverts 3,290 acre-feet. It was a party to 1 court cases that also touched 10 other structures.

Assembled from the figures on this page — every number above is checked against them before it is shown (7 checked). The detail, with its method, is in the cards below.

Download this structure

Everything on this page as data you can work with — and a README that makes it citable: the HydroBase snapshot it was built from, the build commit, what every column means, the method behind each derived figure, and that method's stated limits.

⇩ Full record (.zip) Print / save as PDF

Or one table at a time: rights.csv · annual_use.csv · curtailment_now.csv · court_cases.csv · co_parties.csv · call_climatology.csv

What is in the bundle
  • rights.csv — every decreed right, most senior first, with admin numbers, dates, amounts, uses and case numbers.
  • annual_use.csv — recorded diversion by year, with releases accounted separately.
  • curtailment_now.csv — each right's current priority status and how often it was out across analog years.
  • court_cases.csv — the cases attached to its rights.
  • co_parties.csv — the other structures that were parties to those cases. Not available anywhere else.
  • call_climatology.csv — how often each right has been out of priority by week of season, with confidence intervals and the seasons the record could actually judge.
  • README.txt — provenance, methods, limits, disclaimer, and links back to DWR's own records for verification.

Where it sits

Location as DWR records it (other). Faint dots are the neighbouring water; click any to open it.

Current administration

● In priority — no active call senior to this structure's rights affects its district (28 active call(s) checked).

19 further calls state no district and sit outside this one, so they are counted here rather than assumed either way.

Which of its rights are out of priority?

The outlook for the weeks ahead is not computable for this structure: this structure is not on the modelled flow network, so no reference gage can honestly stand in for it. Today’s position is a separate question, and it is answered in Current administration above — that screen reads the district’s active calls and needs no reference gage.

Where it sits in line

Priority 1957-07-29 — 1024th most senior of the 4793 structures with decreed rights in this water districtDWR's administrative subdivision of a river basin; the unit calls are usually stated in..

Under prior appropriationColorado's rule for sharing water: first in time, first in right. Age decides, not proximity or need., everything ahead of it in this line is satisfied in full before it receives any water. Immediately ahead: BASALT PROJ RF ALT DIV 1 (1957-07-29). Immediately behind: FRY ARK PR CARTER TUNNEL (1957-07-29).

Decreed rights (1)

Admin noDWR's numeric encoding of a water right's seniority. Smaller is more senior; the integer part counts days from 1849-12-31 to the date that ranks the right. AppropriatedWhen water was first put to beneficial use. It sets seniority unless a prior adjudication date is later. AdjudicatedWhen the water court confirmed the right. A use decreed in 1975 was not a decreed use in 1955, however old the appropriation is. AbsoluteA right actually put to use, as opposed to conditional -- a placeholder for a use not yet made. ConditionalA right reserving a place in line for a use not yet made; it must be diligently pursued or it lapses. Alt-pointAn absolute amount decreed at another structure that may be diverted here instead -- an alternate point of diversion or an exchange. DWR calls this the APEX amount; a right showing 0.0 absolute but an alt-point amount is exercised here under another structure's decree. Decreed forWhat the court said this water may be used for -- irrigation, municipal supply, augmentation and so on.Case
39291.00000 1957-07-291958-06-20 0.0 cfs 0.0 100.0 cfs Irrigation, Municipal +3 718

Amounts marked cfs are flow rates; AF are stored volumes (storage rights are decreed in acre-feet). An absolute amount of 0.0 beside an alt-point amount is not a dead right: the water is decreed at another structure, and that row records permission to divert it here instead (an alternate point or exchange). A case listing several numbers reflects the original decree plus later change cases.

Water-court filings naming this structure

1 application in the monthly water-court resumes explicitly reference this WDID. The resume is the earliest public notice of a new claim (C.R.S. 37-92-302) — years before anything reaches the decree record below. Most applications name structures by name rather than WDID, so absence here is weak evidence of absence.

MonthCaseWhat it asksOppose byExcerpt
2025-08 25CW3125 reasonable diligence closed 2025-10-31 25CW3125 EAGLE AND PITKIN COUNTIES . APPLICATION FOR FINDING OF REASONABLE DILIGENCE FOR THE FRYINGPAN-ARKANSAS PROJECT. 1. Name, mailing address, telephone number, and email address of Applicant. Southeastern AUGUST 202…

Source: Judicial Branch combined monthly resumes (archive), indexed nightly; WDIDs attached only when a 7-digit token in the filing matches DWR’s structure inventory.

Recorded use (last 12 years on record)

Years far under the decreed amount? That gap has a name — paper water vs. wet water, explained on this structure.

In a median year this structure has a recorded diversion of 3,290 AF. Its most recent year on record, 2024, came in at 3,676 AF — 112% of that, and 9th lowest of the 12 years with a recorded volume.

YearDiverted (AFA volume: one acre covered a foot deep, about 326,000 gallons -- roughly a suburban household's outdoor use for a year.)Compared with its own recordDays recordedPeak (cfs)
2013 0 1st lowest of 12 · 0% of median 61 0.0
2014 4,001 12th lowest of 12 · 122% of median 365 46.5
2015 3,795 10th lowest of 12 · 115% of median 304 44.9
2016 3,182 6th lowest of 12 · 97% of median 122 45.0
2017 3,640 8th lowest of 12 · 111% of median 214 47.0
2018 2,254 4th lowest of 12 · 68% of median 304 33.8
2019 0 1st lowest of 12 · 0% of median 61 0.0
2020 3,397 7th lowest of 12 · 103% of median 366 48.3
2021 2,031 3rd lowest of 12 · 62% of median 365 38.3
2022 2,576 5th lowest of 12 · 78% of median 365 45.9
2023 3,924 11th lowest of 12 · 119% of median 365 41.8
2024 3,676 9th lowest of 12 · 112% of median 305 55.6

How good is our record of it?

Grade A (9/10 points) — the components below are the finding; the letter alone is not.

The rubric, component by component
CheckStateDetail
identity complete name, type, and water source all on file
decreed rights on file 1 right(s), seniority decoded
diversion record present 3197 measured days; currency unknown (no data-coverage date to compare against)
record continuity continuous 100% of the irrigation seasons in 2013-2024 carry measured days
published-record stability stable no upstream revisions recorded against this structure

Advisory reading aid on public data — not an administrative or legal conclusion, not a title opinion, and not a substitute for DWR administration or an engineer's analysis. Methodology review status is disclosed at hydrohistorian's basin pages.

Hydrohistorian is free, with no ads — one server and a lot of public records. If it earns its keep, you can help keep it running.