← My Water  ·  Print / save as PDF

NESBITT DITCH ALT PT 2

Structure dossier · WDID 5801975 · 1 · SPRING BROOK · DWR record

Where this page's figures come from

Generated 2026-08-27 23:40 by Hydrohistorian. Sources: DWR HydroBase snapshot HydroBase_CO_20260707 (history) + CDSS REST (current), USGS NWIS cross-checks. Engine v0.5.0 (a1c9146) — every figure regenerates from this named code version and data image.

Where it sits

Location as DWR records it. Faint dots are the neighbouring water; click any to open it.

Which of its rights are out of priority?

Not computable for this structure: this structure is not on the modelled flow network, so no reference gage can honestly stand in for it.

Where it sits in line

Priority 1901-06-01569th most senior of the 3097 structures with decreed rights in this water districtDWR's administrative subdivision of a river basin; the unit calls are usually stated in..

Under prior appropriationColorado's rule for sharing water: first in time, first in right. Age decides, not proximity or need., everything ahead of it in this line is satisfied in full before it receives any water. Immediately ahead: NESBITT DITCH ALT PT 1 (1901-06-01). Immediately behind: WHEELER DITCH NO. 7 (1892-05-31).

Decreed rights (2)

Admin noDWR's numeric encoding of a water right's seniority. Smaller is more senior; the integer part counts days from 1849-12-31 to the date that ranks the right. AppropriatedWhen water was first put to beneficial use. It sets seniority unless a prior adjudication date is later. AdjudicatedWhen the water court confirmed the right. A use decreed in 1975 was not a decreed use in 1955, however old the appropriation is. AbsoluteA right actually put to use, as opposed to conditional -- a placeholder for a use not yet made. ConditionalA right reserving a place in line for a use not yet made; it must be diligently pursued or it lapses. UnitsUsesWhat the court said this water may be used for -- irrigation, municipal supply, augmentation and so on.Case
26614.187791901-06-011922-11-23 0.00.0 CIRR 159AAA
46386.334081941-06-201977-12-31 0.00.0 CIRR

Recorded use (last 15 years on record)

In a median year this structure has a recorded diversion of 14 AF. Its most recent year on record, 2025, came in at 47 AF — 336% of that, and 14th lowest of the 15 years with a recorded volume.

YearDiverted (AFA volume: one acre covered a foot deep, about 326,000 gallons -- roughly a suburban household's outdoor use for a year.)Compared with its own recordDays recordedPeak (cfs)
2007 26 10th lowest of 15 · 186% of median 59 0.2
2008 32 11th lowest of 15 · 229% of median 54 0.3
2009 42 12th lowest of 15 · 300% of median 62 0.4
2010 59 15th lowest of 15 · 421% of median 60 0.5
2011 42 12th lowest of 15 · 300% of median 35 0.8
2012 14 7th lowest of 15 · 100% of median 75 0.5
2013 5 4th lowest of 15 · 36% of median 26 0.2
2014 23 9th lowest of 15 · 164% of median 89 0.2
2015 12 5th lowest of 15 · 86% of median 51 0.2
2016 0 1st lowest of 15 · 0% of median 29 0.0
2018 2 3rd lowest of 15 · 14% of median 22 0.1
2022 14 7th lowest of 15 · 100% of median 27 0.4
2023 1 2nd lowest of 15 · 7% of median 8 0.1
2024 12 5th lowest of 15 · 86% of median 9 0.8
2025 47 14th lowest of 15 · 336% of median 54 0.5

How good is our record of it?

Grade B (7/10 points) — the components below are the finding; the letter alone is not.

The rubric, component by component
CheckStateDetail
identity complete name, type, and water source all on file
decreed rights on file 2 right(s), seniority decoded
diversion record present 925 measured days; currency unknown (no data-coverage date to compare against)
record continuity sparse 19% of the irrigation seasons in 2003-2025 carry measured days
published-record stability stable no upstream revisions recorded against this structure

Advisory reading aid on public data — not an administrative or legal conclusion, not a title opinion, and not a substitute for DWR administration or an engineer's analysis. Methodology review status is disclosed at hydrohistorian's basin pages.