← My Water  ·  Print / save as PDF

COLLIN DITCH

Structure dossier · WDID 6801386 · 1 · ONION CREEK · DWR record

Where this page's figures come from

Generated 2026-08-27 23:24 by Hydrohistorian. Sources: DWR HydroBase snapshot HydroBase_CO_20260707 (history) + CDSS REST (current), USGS NWIS cross-checks. Engine v0.5.0 (2deb1d7) — every figure regenerates from this named code version and data image.

Where it sits

Location as DWR records it. Faint dots are the neighbouring water; click any to open it.

Which of its rights are out of priority?

Not computable for this structure: this structure is not on the modelled flow network, so no reference gage can honestly stand in for it.

Where it sits in line

Priority 1932-05-011040th most senior of the 1293 structures with decreed rights in this water districtDWR's administrative subdivision of a river basin; the unit calls are usually stated in..

Under prior appropriationColorado's rule for sharing water: first in time, first in right. Age decides, not proximity or need., everything ahead of it in this line is satisfied in full before it receives any water. Immediately ahead: HORSEFLY HQ RESERVOIR (1910-06-10). Immediately behind: SJR POND PIPELINE (1986-06-30).

Decreed rights (1)

Admin noDWR's numeric encoding of a water right's seniority. Smaller is more senior; the integer part counts days from 1849-12-31 to the date that ranks the right. AppropriatedWhen water was first put to beneficial use. It sets seniority unless a prior adjudication date is later. AdjudicatedWhen the water court confirmed the right. A use decreed in 1975 was not a decreed use in 1955, however old the appropriation is. AbsoluteA right actually put to use, as opposed to conditional -- a placeholder for a use not yet made. ConditionalA right reserving a place in line for a use not yet made; it must be diligently pursued or it lapses. UnitsUsesWhat the court said this water may be used for -- irrigation, municipal supply, augmentation and so on.Case
54056.300711932-05-011998-12-31 0.50.0 CIRR

Recorded use (last 15 years on record)

In a median year this structure has a recorded diversion of 72 AF. Its most recent year on record, 2025, came in at 24 AF — 33% of that, and 6th lowest of the 15 years with a recorded volume.

YearDiverted (AFA volume: one acre covered a foot deep, about 326,000 gallons -- roughly a suburban household's outdoor use for a year.)Compared with its own recordDays recordedPeak (cfs)
2011 482 14th lowest of 15 · 669% of median 118 3.4
2012 271 12th lowest of 15 · 376% of median 38 3.9
2013 206 10th lowest of 15 · 286% of median 66 2.1
2014 530 15th lowest of 15 · 736% of median 108 3.6
2015 203 9th lowest of 15 · 282% of median 75 1.9
2016 245 11th lowest of 15 · 340% of median 94 3.1
2017 285 13th lowest of 15 · 396% of median 65 4.2
2018 1 2nd lowest of 15 · 1% of median 29 0.0
2019 72 8th lowest of 15 · 100% of median 29 2.0
2020 5 3rd lowest of 15 · 7% of median 33 0.1
2021 34 7th lowest of 15 · 47% of median 99 0.2
2022 0 1st lowest of 15 · 0% of median 11 0.0
2023 13 4th lowest of 15 · 18% of median 51 0.2
2024 22 5th lowest of 15 · 31% of median 109 0.2
2025 24 6th lowest of 15 · 33% of median 90 0.2

How good is our record of it?

Grade B (7/10 points) — the components below are the finding; the letter alone is not.

The rubric, component by component
CheckStateDetail
identity complete name, type, and water source all on file
decreed rights on file 1 right(s), seniority decoded
diversion record present 1647 measured days; currency unknown (no data-coverage date to compare against)
record continuity sparse 29% of the irrigation seasons in 1999-2025 carry measured days
published-record stability stable no upstream revisions recorded against this structure

Advisory reading aid on public data — not an administrative or legal conclusion, not a title opinion, and not a substitute for DWR administration or an engineer's analysis. Methodology review status is disclosed at hydrohistorian's basin pages.