← My Water  ·  Print / save as PDF  · 

 ·  every download of this record carries its certificate id

FULTON UNITED AUG STATION

Structure dossier · WDID 0202990 · OTHER · SOUTH PLATTE RIVER · DWR record · probably SOUTH ADAMS COUNTY WSD’s (matched on DWR’s contact or an EPA intake name; verify below)

Source DWR administrative record · verify at DWR structure ↗ Source DWR administrative record · verify at DWR diversion records ↗ Source Our computation, scored against a reference · scored against DWR's call analysis, see /methods

Where this page's figures come from

Generated 2026-09-16 18:19 by Hydrohistorian. Sources: DWR HydroBase snapshot HydroBase_CO_20260707 (history) + CDSS REST (current), USGS NWIS cross-checks. Engine v0.5.0 (956f090) — every figure regenerates from this named code version and data image.

Where this structure is measured

GageFlowing nowRecordHow we know
FULTON UNITED AUG STATION 0202990A 3.38 cfs 2022–2026, 1,634 days DWR telemetry mapping

A green link is DWR's own: either its telemetry inventory maps this WDID to that station, or the station is named for this WDID (0700553 → 0700553A). An amber one is ours — the station sits within 250 m and shares a distinctive word with this structure's name, which is a strong hint rather than a DWR statement that this gage meters this structure. Wrong? Tell us.

Flowing now

3.38 cfs as of 2026-09-16 14:45 (3.6 h ago)

Provisional 15-minute telemetry from 0202990A ↗ (FULTON UNITED AUG STATION). Raw, not the approved record — it is never merged into the diversion history below. DWR publishes the official diversion record after the water year closes and is approved, which is why that record ends months back while this reads minutes ago.

In short

In a median year over its last 3 recorded years it diverts 432 acre-feet.

Assembled from the figures on this page — every number above is checked against them before it is shown (2 checked). The detail, with its method, is in the cards below.

Download this structure

Everything on this page as data you can work with — and a README that makes it citable: the HydroBase snapshot it was built from, the build commit, what every column means, the method behind each derived figure, and that method's stated limits.

⇩ Full record (.zip) Print / save as PDF

Or one table at a time: rights.csv · annual_use.csv · curtailment_now.csv · court_cases.csv · co_parties.csv · call_climatology.csv

What is in the bundle
  • rights.csv — every decreed right, most senior first, with admin numbers, dates, amounts, uses and case numbers.
  • annual_use.csv — recorded diversion by year, with releases accounted separately.
  • curtailment_now.csv — each right's current priority status and how often it was out across analog years.
  • court_cases.csv — the cases attached to its rights.
  • co_parties.csv — the other structures that were parties to those cases. Not available anywhere else.
  • call_climatology.csv — how often each right has been out of priority by week of season, with confidence intervals and the seasons the record could actually judge.
  • README.txt — provenance, methods, limits, disclaimer, and links back to DWR's own records for verification.

Where it sits

Location as DWR records it (other). Faint dots are the neighbouring water; click any to open it.

Which of its rights are out of priority?

Not computable for this structure: no decreed right on file, so there is no priority to test.

Filings that would move water above this headgate

1 water-court application in the monthly resumes names a structure on SOUTH PLATTE RIVER upstream of this headgate. A new right, exchange or change of use up there changes what arrives down here — the resume is the public notice, and the opposition window is how anyone affected answers it.

MonthCaseWhat it asksUpstream structuresOppose by
2024-12 2024CW3183 LUPTON BOTTOM DITCH (2.0 mi up) 2025-02-28

Judged on this structure’s own named stream only — a filing on a tributary that joins upstream is not judged here. Filings that name structures only in prose, without a WDID, are invisible to this card. Reading aid, not legal advice; the deadline is computed from C.R.S. 37-92-302(3), and the court’s own notice controls.

Recorded use (last 3 years on record)

Years far under the decreed amount? That gap has a name — paper water vs. wet water, explained on this structure.

In a median year this structure has a recorded diversion of 432 AF. Its most recent year on record, 2025, came in at 833 AF — 193% of that, and 3rd lowest of the 3 years with a recorded volume.

This structure records both diversions and reservoir releases — they are separate water movements and are accounted separately below.

YearDiverted (AFA volume: one acre covered a foot deep, about 326,000 gallons -- roughly a suburban household's outdoor use for a year.)Compared with its own recordReleased (AF)Days recordedPeak (cfs)
2023 432 2nd lowest of 3 · 100% of median 432 160 4.4
2024 234 1st lowest of 3 · 54% of median 234 305 4.1
2025 833 3rd lowest of 3 · 193% of median 833 214 4.1

How good is our record of it?

Grade B (7/10 points) — the components below are the finding; the letter alone is not.

The rubric, component by component
CheckStateDetail
identity complete name, type, and water source all on file
decreed rights absent no water rights cached for this WDID
diversion record present 679 measured days; currency unknown (no data-coverage date to compare against)
record continuity continuous 100% of the irrigation seasons in 2023-2025 carry measured days
published-record stability stable no upstream revisions recorded against this structure

Advisory reading aid on public data — not an administrative or legal conclusion, not a title opinion, and not a substitute for DWR administration or an engineer's analysis. Methodology review status is disclosed at hydrohistorian's basin pages.

Hydrohistorian is free, with no ads — one server and a lot of public records. If it earns its keep, you can help keep it running.