← My Water · All reservoirs in this district · Print / save as PDF ·
· every download of this record carries its certificate idNWRF RESERVOIR
Structure dossier · WDID 0603010 · RESERVOIR · BOULDER CREEK · DWR record · probably ERIE TOWN OF’s (matched on DWR’s contact or an EPA intake name; verify below)
Nwrf Reservoir is a reservoir on Boulder Creek in Colorado. This page is its public record: the water it has a right to, whether it may take it today, and its history, compiled from the Colorado Division of Water Resources.
Source DWR administrative record · verify at DWR structure ↗ Source DWR administrative record · verify at DWR diversion records ↗ Source Our computation, scored against a reference · scored against DWR's call analysis, see /methods
Where this page's figures come from
Generated 2026-10-16 21:43 by Hydrohistorian. Sources: DWR HydroBase snapshot HydroBase_CO_20260928 (history) + CDSS REST (current), USGS NWIS cross-checks. Engine v0.5.0 (c7f5ca1) — every figure regenerates from this named code version and data image.
The record and the river
In short
NWRF RESERVOIR holds 1 decreed right on BOULDER CREEK. No active call senior to its rights reaches its district today (17 active calls checked), so it is in priority now. 6 further calls state no district and sit outside this one, so they are counted here rather than assumed either way. That is today's position; the weeks ahead cannot be projected for it: only 1 analog year(s) have both flow and a complete administration record; 4 needed.
Assembled from the figures on this page — every number above is checked against them before it is shown (5 checked). The detail, with its method, is in the cards below.
Download this structure
Everything on this page as data you can work with — and a README that makes it citable: the HydroBase snapshot it was built from, the build commit, what every column means, the method behind each derived figure, and that method's stated limits.
⇩ Full record (.zip) Print / save as PDF
Or one table at a time: rights.csv · annual_use.csv · curtailment_now.csv · court_cases.csv · co_parties.csv · call_climatology.csv
What is in the bundle
rights.csv— every decreed right, most senior first, with admin numbers, dates, amounts, uses and case numbers.annual_use.csv— recorded diversion by year, with releases accounted separately.curtailment_now.csv— each right's current priority status and how often it was out across analog years.court_cases.csv— the cases attached to its rights.co_parties.csv— the other structures that were parties to those cases. Not available anywhere else.call_climatology.csv— how often each right has been out of priority by week of season, with confidence intervals and the seasons the record could actually judge.README.txt— provenance, methods, limits, disclaimer, and links back to DWR's own records for verification.
Where it sits
Location as DWR records it (storage). Faint dots are the neighbouring water; click any to open it.
Current administration
● In priority — no active call senior to this structure's rights affects its district (17 active call(s) checked).
6 further calls state no district and sit outside this one, so they are counted here rather than assumed either way.
Which of its rights are out of priority?
The outlook for the weeks ahead is not computable for this structure: only 1 analog year(s) have both flow and a complete administration record; 4 needed. Today’s position is a separate question, and it is answered in Current administration above — that screen reads the district’s active calls and needs no reference gage.
Where it sits in line
Priority 2010-12-14 — 1843rd most senior of the 1867 structures with decreed rights in this water districtDWR's administrative subdivision of a river basin; the unit calls are usually stated in..
Under prior appropriationColorado's rule for sharing water: first in time, first in right. Age decides, not proximity or need., everything ahead of it in this line is satisfied in full before it receives any water. Immediately ahead: SOUTH WATER RECLAMATION FACILITY (2010-12-14). Immediately behind: 0606148 (1969-02-27).
On MAINSTEM at river mile 26.1, it is 56th of 78 down the reach. Immediately upstream: ARMSTEAD DITCH. Immediately downstream: FILLY LAKE.
Position on the modelled network, not a claim about whose water this is — a stream carries water from many rights at once, and diverted water returns to it.
Decreed rights (2)
| Admin noDWR's numeric encoding of a water right's seniority. Smaller is more senior; the integer part counts days from 1849-12-31 to the date that ranks the right. | AppropriatedWhen water was first put to beneficial use. It sets seniority unless a prior adjudication date is later. | AdjudicatedWhen the water court confirmed the right. A use decreed in 1975 was not a decreed use in 1955, however old the appropriation is. | AbsoluteA right actually put to use, as opposed to conditional -- a placeholder for a use not yet made. | ConditionalA right reserving a place in line for a use not yet made; it must be diligently pursued or it lapses. | Alt-pointAn absolute amount decreed at another structure that may be diverted here instead -- an alternate point of diversion or an exchange. DWR calls this the APEX amount; a right showing 0.0 absolute but an alt-point amount is exercised here under another structure's decree. | Decreed forWhat the court said this water may be used for -- irrigation, municipal supply, augmentation and so on. | Case |
|---|---|---|---|---|---|---|---|
| 58787.00000 | 2010-12-14 | 2010-12-31 | 0.0 AF | 1000.0 AF | — | Irrigation, Industrial +1 | 10CW0292 |
| 58787.00000 | 2010-12-14 | 2010-12-31 | 0.0 cfs | 11.2 cfs | — | Irrigation, Industrial +1 | 10CW0292 |
Amounts marked cfs are flow rates; AF are stored volumes (storage rights are decreed in acre-feet). An absolute amount of 0.0 beside an alt-point amount is not a dead right: the water is decreed at another structure, and that row records permission to divert it here instead (an alternate point or exchange). A case listing several numbers reflects the original decree plus later change cases.
Legal record & documents
1 decreed actions on record across
1 court case:
10CW0292.
Every case, dated
| Case | Actions | Latest adjudication | Types |
|---|---|---|---|
10CW0292 | 1 | 2010-12-31 | S |
182 imaged documents on DWR’s shelf for this structure — 16 water-court documents across 2 cases, including 2 decrees. Every row opens the scanned PDF at DWR. Listing as of 2026-09-04.
- Decree in case 18CW3179 ↗ · imaged 2019-04-30 · 8 pages
- Decree in case 10CW0292 ↗ · imaged 2012-11-07 · 16 pages
“Imaged” is the date DWR’s archive filed the scan, which is often years after the court acted (a 1911 decree can be imaged in 2011). The court’s own date is the adjudication date in the rights table.
Court record (16)
| Imaged | Case | Type | Pages | |
|---|---|---|---|---|
| 2025-02-26 | 18CW3179 |
NOTICE (DISMISSAL, ETC) | 1 | open ↗ |
| 2019-04-30 | 18CW3179 |
DECREE | 8 | open ↗ |
| 2019-04-03 | 18CW3179 |
REFEREE'S RULING | 8 | open ↗ |
| 2019-03-11 | 18CW3179 |
SUMMARY OF CONSULTATION | 2 | open ↗ |
| 2018-11-13 | 18CW3179 |
APPLICATION | 8 | open ↗ |
| 2012-11-07 | 10CW0292 |
DECREE | 16 | open ↗ |
| 2012-10-17 | 10CW0292 |
REFEREE'S RULING | 18 | open ↗ |
| 2012-08-17 | 10CW0292 |
STIPULATION/SETTLEMENT | 21 | open ↗ |
| 2012-08-14 | 10CW0292 |
STIPULATION/SETTLEMENT | 17 | open ↗ |
| 2012-08-02 | 10CW0292 |
STIPULATION/SETTLEMENT | 2 | open ↗ |
| 2011-12-28 | 10CW0292 |
STIPULATION/SETTLEMENT | 3 | open ↗ |
| 2011-05-02 | 10CW0292 |
SUMMARY OF CONSULTATION | 3 | open ↗ |
| 2011-03-14 | 10CW0292 |
STATEMENT OF OPPOSITION | 8 | open ↗ |
| 2011-03-07 | 10CW0292 |
STATEMENT OF OPPOSITION | 4 | open ↗ |
| 2011-02-24 | 10CW0292 |
STATEMENT OF OPPOSITION | 4 | open ↗ |
| 2010-12-30 | 10CW0292 |
APPLICATION | 9 | open ↗ |
Division filings (166)
| Date | Type | Pages | |
|---|---|---|---|
| 2026-08-18 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2026_7_31_8/18/2026 3:31:03 PM | open ↗ | |
| 2026-07-15 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2026_6_30_7/15/2026 5:03:28 PM | open ↗ | |
| 2026-06-22 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2026_5_31_6/22/2026 3:34:00 PM | open ↗ | |
| 2026-05-26 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2026_4_30_5/26/2026 9:43:55 AM | open ↗ | |
| 2026-04-08 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2026_3_31_4/8/2026 4:42:01 PM | open ↗ | |
| 2026-03-25 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2026_2_28_3/25/2026 12:55:26 PM | open ↗ | |
| 2026-02-26 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2026_1_31_2/26/2026 12:13:44 PM | open ↗ | |
| 2026-01-15 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2025_12_31_1/15/2026 5:16:10 PM | open ↗ | |
| 2025-12-09 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2025_11_30_12/9/2025 4:12:56 PM | open ↗ | |
| 2025-11-04 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2025_10_31_11/4/2025 2:05:16 PM | open ↗ | |
| 2025-10-16 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2025_9_30_10/16/2025 3:09:29 PM | open ↗ | |
| 2025-09-24 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2025_8_31_9/24/2025 4:59:32 PM | open ↗ | |
| 2025-08-04 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2025_7_31_8/4/2025 5:17:33 PM | open ↗ | |
| 2025-07-22 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2025_6_30_7/22/2025 12:54:02 PM | open ↗ | |
| 2025-06-24 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2025_5_31_6/24/2025 4:14:28 PM | open ↗ | |
| 2025-05-22 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2025_4_30_5/22/2025 2:09:29 PM | open ↗ | |
| 2025-04-23 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2025_3_31_4/23/2025 12:32:51 PM | open ↗ | |
| 2025-03-31 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2025_2_28_3/31/2025 7:53:46 AM | open ↗ | |
| 2025-02-26 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2025_1_31_2/26/2025 11:05:19 AM | open ↗ | |
| 2025-01-29 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2024_12_31_1/29/2025 9:12:55 AM | open ↗ | |
| 2024-12-20 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2024_11_30_12/20/2024 10:21:03 AM | open ↗ | |
| 2024-11-22 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2024_10_31_11/22/2024 10:12:03 AM | open ↗ | |
| 2024-10-28 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2024_9_30_10/28/2024 1:35:15 PM | open ↗ | |
| 2024-09-30 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2024_8_31_9/30/2024 9:58:46 AM | open ↗ | |
| 2024-08-23 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2024_7_31_8/23/2024 1:03:26 PM | open ↗ | |
| 2024-07-29 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2024_6_30_7/29/2024 5:23:40 PM | open ↗ | |
| 2024-06-28 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2024_5_31_6/28/2024 12:10:25 PM | open ↗ | |
| 2024-05-28 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2024_4_30_5/28/2024 12:49:52 PM | open ↗ | |
| 2024-04-30 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2024_3_31_4/30/2024 11:35:55 AM | open ↗ | |
| 2024-03-28 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2024_2_28_3/28/2024 1:03:37 PM | open ↗ | |
| 2024-02-14 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2024_1_31_2/14/2024 2:05:27 PM | open ↗ | |
| 2024-01-31 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2023_12_31_1/31/2024 10:37:02 AM | open ↗ | |
| 2023-12-18 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2023_11_30_12/18/2023 11:18:36 AM | open ↗ | |
| 2023-11-14 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2023_10_31_11/14/2023 1:54:30 PM | open ↗ | |
| 2023-10-27 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2023_9_30_10/27/2023 11:53:44 AM | open ↗ | |
| 2023-09-26 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2023_8_31_9/26/2023 1:00:36 PM | open ↗ | |
| 2023-08-22 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2023_7_31_8/22/2023 1:00:26 PM | open ↗ | |
| 2023-07-10 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2023_6_30_7/10/2023 11:05:58 AM | open ↗ | |
| 2023-06-26 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2023_5_31_6/26/2023 1:15:25 PM | open ↗ | |
| 2023-05-31 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2023_4_30_5/31/2023 3:14:13 PM | open ↗ | |
| 2023-04-28 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2023_3_31_4/28/2023 8:44:51 AM | open ↗ | |
| 2023-03-22 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2023_2_28_3/22/2023 2:11:51 PM | open ↗ | |
| 2023-02-28 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2023_1_31_2/28/2023 8:39:50 AM | open ↗ | |
| 2023-01-25 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2022_12_31_1/25/2023 11:17:40 AM | open ↗ | |
| 2022-12-30 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2022_11_30_12/30/2022 1:11:46 PM | open ↗ | |
| 2022-11-22 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2022_10_31_11/22/2022 8:29:06 AM | open ↗ | |
| 2022-10-24 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2022_9_30_10/24/2022 1:03:43 PM | open ↗ | |
| 2022-09-30 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2022_8_31_9/30/2022 11:54:05 AM | open ↗ | |
| 2022-08-30 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2022_7_31_8/30/2022 9:19:51 AM | open ↗ | |
| 2022-07-27 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2022_6_30_7/27/2022 12:32:00 PM | open ↗ | |
| 2022-06-30 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2022_5_31_6/30/2022 11:15:34 AM | open ↗ | |
| 2022-05-25 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2022_4_30_5/25/2022 9:26:33 AM | open ↗ | |
| 2022-04-27 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2022_3_31_4/27/2022 9:49:21 AM | open ↗ | |
| 2022-03-28 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2022_2_28_3/28/2022 1:09:33 PM | open ↗ | |
| 2022-03-01 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2021_11_30_3/1/2022 7:46:03 AM | open ↗ | |
| 2022-03-01 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2021_12_31_3/1/2022 7:46:39 AM | open ↗ | |
| 2022-03-01 | Accounting & Spreadsheets NWRF/ERIE 10CW0292_2022_1_31_3/1/2022 7:47:08 AM | open ↗ | |
| 2021-11-23 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 OCT 2021 | 49 | open ↗ |
| 2021-11-01 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 SEP 2021 | 49 | open ↗ |
| 2021-09-30 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 AUG 2021 | 49 | open ↗ |
| 2021-08-30 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 JUL 2021 | 46 | open ↗ |
| 2021-07-27 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 JUN 2021 | 46 | open ↗ |
| 2021-06-28 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 MAY 2021 | 45 | open ↗ |
| 2021-05-25 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 APR 2021 | 44 | open ↗ |
| 2021-04-30 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 MAR 2021 | 44 | open ↗ |
| 2021-03-31 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 FEB 2021 | 44 | open ↗ |
| 2021-02-08 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 JAN 2021 | 44 | open ↗ |
| 2021-01-27 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 DEC 2020 | 44 | open ↗ |
| 2020-12-09 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 NOV 2020 | 44 | open ↗ |
| 2020-11-12 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 OCT 2020 | 43 | open ↗ |
| 2020-10-22 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 SEP 2020 | 43 | open ↗ |
| 2020-09-28 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 AUG 2020 | 42 | open ↗ |
| 2020-08-12 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 JUL 2020 | 42 | open ↗ |
| 2020-07-23 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 JUN 2020 | 42 | open ↗ |
| 2020-06-05 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 APR 2020 | 41 | open ↗ |
| 2020-06-05 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 MAY 2020 | 41 | open ↗ |
| 2020-04-27 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 MAR 2020 | 41 | open ↗ |
| 2020-03-16 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 FEB 2020 | 41 | open ↗ |
| 2020-02-10 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 JAN 2020 | 40 | open ↗ |
| 2020-01-14 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 DEC 2019 | 39 | open ↗ |
| 2019-12-12 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 NOV 2019 | 38 | open ↗ |
| 2019-11-08 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 OCT 2019 | 38 | open ↗ |
| 2019-10-03 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 SEP 2019 | 38 | open ↗ |
| 2019-09-16 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 AUG 2019 | 38 | open ↗ |
| 2019-08-15 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 JUL 2019 | 38 | open ↗ |
| 2019-07-15 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 JUN 2019 | 37 | open ↗ |
| 2019-06-25 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 MAY 2019 | 37 | open ↗ |
| 2019-05-13 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 APR 2019 | 37 | open ↗ |
| 2019-04-24 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 MAR 2019 | 37 | open ↗ |
| 2019-03-26 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 FEB 2019 | 36 | open ↗ |
| 2019-02-15 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 JAN 2019 | 36 | open ↗ |
| 2019-01-16 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 DEC 2018 | 36 | open ↗ |
| 2018-12-06 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 NOV 2018 | 36 | open ↗ |
| 2018-11-06 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 OCT 2018 | 34 | open ↗ |
| 2018-10-10 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 SEP 2018 | 34 | open ↗ |
| 2018-09-06 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 AUG 2018 | 34 | open ↗ |
| 2018-08-02 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 JUL 2018 | 33 | open ↗ |
| 2018-07-05 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 JUN 2018 | 33 | open ↗ |
| 2018-06-05 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 MAY 2018 | 33 | open ↗ |
| 2018-05-02 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 APR 2018 | 33 | open ↗ |
| 2018-04-04 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 MAR 2018 | 33 | open ↗ |
| 2018-03-06 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 FEB 2018 | 31 | open ↗ |
| 2018-02-19 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 JAN 2018 | 31 | open ↗ |
| 2018-01-04 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 DEC 2017 | 31 | open ↗ |
| 2017-12-06 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 NOV 2017 | 31 | open ↗ |
| 2017-11-03 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 OCT 2017 | 31 | open ↗ |
| 2017-10-03 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 SEP 2017 | 30 | open ↗ |
| 2017-09-07 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 AUG 2017 | 30 | open ↗ |
| 2017-08-07 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 JUL 2017 | 30 | open ↗ |
| 2017-07-06 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 JUN 2017 | 29 | open ↗ |
| 2017-06-12 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 MAY 2017 V2 | 28 | open ↗ |
| 2017-06-05 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 MAY 2017 | 28 | open ↗ |
| 2017-05-03 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 APR 2017 | 28 | open ↗ |
| 2017-04-13 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 MAR 2017 | 28 | open ↗ |
| 2017-03-02 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 FEB 2017 | 28 | open ↗ |
| 2017-02-02 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 JAN 2017 | 27 | open ↗ |
| 2017-01-05 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 DEC 2016 | 27 | open ↗ |
| 2016-12-06 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 NOV 2016 | 27 | open ↗ |
| 2016-11-08 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 OCT 2016 | 27 | open ↗ |
| 2016-10-06 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 SEP 2016 | 27 | open ↗ |
| 2016-09-12 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 AUG 2016 | 26 | open ↗ |
| 2016-08-08 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 JUL 2016 | 26 | open ↗ |
| 2016-07-07 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 JUN 2016 | 26 | open ↗ |
| 2016-06-07 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 MAY 2016 | 24 | open ↗ |
| 2016-05-11 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 APR 2016 | 24 | open ↗ |
| 2016-04-08 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 MAR 2016 | 24 | open ↗ |
| 2016-03-16 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 FEB 2016 | 24 | open ↗ |
| 2016-02-09 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 JAN 2016 | 24 | open ↗ |
| 2016-01-07 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 DEC 2015 | 23 | open ↗ |
| 2015-12-07 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 NOV 2015 | 23 | open ↗ |
| 2015-11-02 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 OCT 2015 | 23 | open ↗ |
| 2015-10-08 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 SEP 2015 | 22 | open ↗ |
| 2015-09-18 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 AUG 2015 | 21 | open ↗ |
| 2015-08-21 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 JUL 2015 | 21 | open ↗ |
| 2015-07-08 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 JUN 2015 | 21 | open ↗ |
| 2015-06-09 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 MAY 2015 | 21 | open ↗ |
| 2015-05-06 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 APR 2015 | 19 | open ↗ |
| 2015-04-02 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 MAR 2015 | 18 | open ↗ |
| 2015-03-09 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 FEB 2015 | 18 | open ↗ |
| 2015-02-06 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 JAN 2015 | 18 | open ↗ |
| 2015-01-08 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 DEC 2014 | 18 | open ↗ |
| 2014-12-15 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 NOV 2014 | 17 | open ↗ |
| 2014-12-10 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 NOV 2014 | 17 | open ↗ |
| 2014-11-04 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 OCT 2014 | 17 | open ↗ |
| 2014-10-31 | Correspondence COMPACT CLAY LINER APPROVAL | 1 | open ↗ |
| 2014-10-07 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 SEP 2014 | 17 | open ↗ |
| 2014-09-05 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 AUG 2014 | 17 | open ↗ |
| 2014-08-05 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 JUL 2014 | 16 | open ↗ |
| 2014-07-11 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 JUN 2014 | 16 | open ↗ |
| 2014-06-20 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 MAY 2014 | 15 | open ↗ |
| 2014-05-07 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 APR 2014 | 15 | open ↗ |
| 2014-04-01 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 MAR 2014 | 15 | open ↗ |
| 2014-03-04 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 FEB 2014 | 14 | open ↗ |
| 2014-02-06 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 JAN 2014 | 14 | open ↗ |
| 2014-01-07 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 NOV 2013 DEC 2013 | 14 | open ↗ |
| 2013-11-04 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 OCT 2013 | 14 | open ↗ |
| 2013-10-10 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 SEP 2013 | 12 | open ↗ |
| 2013-09-06 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 AUG 2013 | 12 | open ↗ |
| 2013-08-08 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 JUL 2013 | 12 | open ↗ |
| 2013-07-08 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 JUN 2013 | 11 | open ↗ |
| 2013-06-11 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 MAY 2013 | 11 | open ↗ |
| 2013-05-07 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 APR 2013 | 5 | open ↗ |
| 2013-04-10 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 MAR 2013 | 7 | open ↗ |
| 2013-03-08 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 FEB 2013 | 8 | open ↗ |
| 2013-02-21 | Accounting & Spreadsheets NWRF/ERIE 10CW0292 NOV 2012 - JAN 2013 | 13 | open ↗ |
| 2012-08-06 | Correspondence LINER APPROVAL | 1 | open ↗ |
Imaged documents at DWR. DWR keeps the scanned documents for this structure — decrees, rulings, plats, correspondence — in its Laserfiche archive. Open the list directly: imaged documents for 0603010 ↗ (indexed by structure, not by case — the cases listed above appear within the list).
Other DWR records for this structure: DWR’s page for this structure ↗ — net amounts, water rights, transactions & adjudication history, and diversion records, all on that one page. On this site: the district’s full legal picture →
Filings that would move water above this headgate
4 water-court applications in the monthly resumes name a structure on BOULDER CREEK upstream of this headgate. A new right, exchange or change of use up there changes what arrives down here — the resume is the public notice, and the opposition window is how anyone affected answers it.
| Month | Case | What it asks | Upstream structures | Oppose by |
|---|---|---|---|---|
| 2026-08 | 2026CW3125 |
reasonable diligence | LOWER BOULDER DITCH (6.2 mi up), LAFAYETTE BLDR C ALT PT (9.6 mi up) | 2026-10-31 (15d) |
| 2026-06 | 2026CW3093 |
reasonable diligence | LOWER BOULDER DITCH (6.2 mi up), LAFAYETTE BLDR C ALT PT (9.6 mi up) | 2026-08-31 |
| 2025-10 | 2025CW3137 |
reasonable diligence | LOWER BOULDER DITCH (6.2 mi up), LAFAYETTE BLDR C ALT PT (9.6 mi up) | 2025-12-31 |
| 2025-04 | 2025CW3049 |
reasonable diligence | LOWER BOULDER DITCH (6.2 mi up), LAFAYETTE BLDR C ALT PT (9.6 mi up) | 2025-06-30 |
Judged on this structure’s own named stream only — a filing on a tributary that joins upstream is not judged here. Filings that name structures only in prose, without a WDID, are invisible to this card. Reading aid, not legal advice; the deadline is computed from C.R.S. 37-92-302(3), and the court’s own notice controls.
How often is it out of priority?
Across the 12 seasons whose call record is complete enough to judge this structure (2015, 2016, 2017, 2018, 2019, 2020, 2021, 2022, 2023, 2024, 2025, 2026), week by week from April.
58787.00000 · peaks at
12 of 12 seasons
Snow sets the clock here. In the driest third of snow years (4 seasons), the call settled in for the season around July 15 (June 3 to July 15 across those years); in 1 of them it never lifted at all. In the middle third (4 seasons), the call settled in for the season around June 24 (June 17 to July 8 across those years); in 1 of them it never lifted at all. In the wettest third (4 seasons), the call settled in for the season around June 24 (June 17 to June 24 across those years); in 2 of them it never lifted at all.
Snow years ranked by the district’s April 1 snow-water percentile across 3 SNOTEL sites; 12 seasons carry both a snow reading and a judgeable call record. How the past played out, not a forecast.
Why only 12 seasons, and what the bars mean
Each bar is one week: how many of those seasons that right was out of priority under a call this site can lawfully attribute to this structure. Green is never, red is every season on record.
The short record is a property of DWR's data, not of the river. A call only counts against a structure when we can establish it applies — by the districts named in its set comments, or by stream mile on the same source. DWR did not begin stating affected districts routinely until about 2015: fewer than one call in ten can be judged before then, against roughly two in three since. A season we cannot judge is not a season without calls, so it is dropped rather than counted as quiet — 11 seasons dropped here.
This is a frequency over past seasons, not a forecast. It says nothing about what the division engineer will do this year.
Trends for this structure
Its reference gage, Erie North Water Effluent: no clear flow trend.
How good is our record of it?
Grade C (6/10 points) — the components below are the finding; the letter alone is not.
The rubric, component by component
| Check | State | Detail |
|---|---|---|
| identity | complete | name, type, and water source all on file |
| decreed rights | on file | 2 right(s), seniority decoded |
| diversion record | absent | no diversion records cached |
| record continuity | unknown | no record span to measure against |
| published-record stability | stable | no upstream revisions recorded against this structure |
Advisory reading aid on public data — not an administrative or legal conclusion, not a title opinion, and not a substitute for DWR administration or an engineer's analysis. Methodology review status is disclosed at hydrohistorian's basin pages.
Hydrohistorian is free, with no ads — one server and a lot of public records. If it earns its keep, you can help keep it running.