← My Water  ·  Print / save as PDF

HENRY WANEKA RES 1

Structure dossier · WDID 0604203 · RESERVOIR · SOUTH BOULDER CREEK · DWR record

Where this page's figures come from

Generated 2026-08-27 23:01 by Hydrohistorian. Sources: DWR HydroBase snapshot HydroBase_CO_20260707 (history) + CDSS REST (current), USGS NWIS cross-checks. Engine v0.5.0 (96d5528) — every figure regenerates from this named code version and data image.

Where it sits

Location as DWR records it. Faint dots are the neighbouring water; click any to open it.

Which of its rights are out of priority?

Not computable for this structure: no administrative call record for this basin.

Where it sits in line

Priority 1872-04-1592nd most senior of the 1867 structures with decreed rights in this water districtDWR's administrative subdivision of a river basin; the unit calls are usually stated in..

Under prior appropriationColorado's rule for sharing water: first in time, first in right. Age decides, not proximity or need., everything ahead of it in this line is satisfied in full before it receives any water. Immediately ahead: 0604201 (1872-04-15). Immediately behind: KINNEAR DITCH NO 2 (1872-05-20).

On SOUTH BOULDER CREEK at river mile 16.4, it is 36th of 58 down the reach. Immediately upstream: GREENLEE RES 1. Immediately downstream: HUNTER/HINE DITCH.

Position on the modelled network, not a claim about whose water this is — a stream carries water from many rights at once, and diverted water returns to it.

Decreed rights (9)

Admin noDWR's numeric encoding of a water right's seniority. Smaller is more senior; the integer part counts days from 1849-12-31 to the date that ranks the right. AppropriatedWhen water was first put to beneficial use. It sets seniority unless a prior adjudication date is later. AdjudicatedWhen the water court confirmed the right. A use decreed in 1975 was not a decreed use in 1955, however old the appropriation is. AbsoluteA right actually put to use, as opposed to conditional -- a placeholder for a use not yet made. ConditionalA right reserving a place in line for a use not yet made; it must be diligently pursued or it lapses. UnitsUsesWhat the court said this water may be used for -- irrigation, municipal supply, augmentation and so on.Case
8141.01872-04-151882-06-02 0.00.0 AIRRMUNRECFISDOMOTHWLD
8553.01873-06-011882-06-02 0.00.0 AIRRMUNRECFISDOMOTHWLD
15386.01892-02-151907-03-13 0.00.0 AIRRMUNRECFISDOMWLD
20188.115671881-09-011907-03-13 1.00.0 AIRR
20188.127241884-11-011907-03-13 52.00.0 AIRR
20188.174411897-10-011907-03-13 172.00.0 AIRR
20624.01906-06-201909-11-03 436.260.0 AINDOTH
20890.206241906-06-201909-11-03 436.260.0 AIRRMUNRECFISDOMOTHWLD
27930.239811915-08-291953-09-28 0.00.0 AIRRMUNRECFISDOMWLD

Recorded use (last 5 years on record)

In a median year this structure has a recorded diversion of 208 AF. Its most recent year on record, 2020, came in at 224 AF — 108% of that, and 4th lowest of the 5 years with a recorded volume.

YearDiverted (AFA volume: one acre covered a foot deep, about 326,000 gallons -- roughly a suburban household's outdoor use for a year.)Compared with its own recordDays recordedPeak (cfs)
1978 714 5th lowest of 5 · 343% of median 25 20.0
1979 208 3rd lowest of 5 · 100% of median 13 10.0
2014 64 1st lowest of 5 · 31% of median 10 5.0
2016 84 2nd lowest of 5 · 40% of median 18 8.3
2020 224 4th lowest of 5 · 108% of median 36 12.3

How good is our record of it?

Grade B (7/10 points) — the components below are the finding; the letter alone is not.

The rubric, component by component
CheckStateDetail
identity complete name, type, and water source all on file
decreed rights on file 9 right(s), seniority decoded
diversion record fragment 102 measured day(s) on file (under 180 -- a season, not a history)
record continuity unknown record too short to assess continuity (needs 2+ years of span and 180+ measured days)
published-record stability stable no upstream revisions recorded against this structure

Advisory reading aid on public data — not an administrative or legal conclusion, not a title opinion, and not a substitute for DWR administration or an engineer's analysis. Methodology review status is disclosed at hydrohistorian's basin pages.