← My Water · Print / save as PDF
HICKLAND DITCH
Structure dossier · WDID 1500564 · 1 · GRANEROS CREEK · DWR record
Where this page's figures come from
Generated 2026-08-27 23:01 by Hydrohistorian. Sources: DWR HydroBase snapshot HydroBase_CO_20260707 (history) + CDSS REST (current), USGS NWIS cross-checks. Engine v0.5.0 (2deb1d7) — every figure regenerates from this named code version and data image.
Where it sits
Location as DWR records it. Faint dots are the neighbouring water; click any to open it.
Which of its rights are out of priority?
Not computable for this structure: this structure is not on the modelled flow network, so no reference gage can honestly stand in for it.
Where it sits in line
Priority 1866-03-05 — 29th most senior of the 704 structures with decreed rights in this water districtDWR's administrative subdivision of a river basin; the unit calls are usually stated in..
Under prior appropriationColorado's rule for sharing water: first in time, first in right. Age decides, not proximity or need., everything ahead of it in this line is satisfied in full before it receives any water. Immediately ahead: GOSS DITCH HDGT NO 2 (1865-12-31). Immediately behind: WAGNER DITCH (1866-03-31).
Decreed rights (2)
| Admin noDWR's numeric encoding of a water right's seniority. Smaller is more senior; the integer part counts days from 1849-12-31 to the date that ranks the right. | AppropriatedWhen water was first put to beneficial use. It sets seniority unless a prior adjudication date is later. | AdjudicatedWhen the water court confirmed the right. A use decreed in 1975 was not a decreed use in 1955, however old the appropriation is. | AbsoluteA right actually put to use, as opposed to conditional -- a placeholder for a use not yet made. | ConditionalA right reserving a place in line for a use not yet made; it must be diligently pursued or it lapses. | Units | UsesWhat the court said this water may be used for -- irrigation, municipal supply, augmentation and so on. | Case |
|---|---|---|---|---|---|---|---|
| 5908.0 | 1866-03-05 | 1893-06-26 | 1.4 | 0.0 | C | IRR | 20 |
| 10227.0 | 1877-12-31 | 1893-06-26 | 0.8 | 0.0 | C | IRR | 113 |
Legal record & documents
2 decreed actions on record across
1 court case:
CA2756.
Every case, dated
| Case | Actions | Latest adjudication | Types |
|---|---|---|---|
CA2756 | 2 | 1893-06-26 | O |
DWR's own records for this structure: net amounts · transactions & adjudication history · scanned decrees (search a case number there for the imaged document). On this site: the district's full legal picture →
Recorded use (last 15 years on record)
In a median year this structure has a recorded diversion of 63 AF. Its most recent year on record, 2025, came in at 57 AF — 90% of that, and 7th lowest of the 15 years with a recorded volume.
| Year | Diverted (AFA volume: one acre covered a foot deep, about 326,000 gallons -- roughly a suburban household's outdoor use for a year.) | Compared with its own record | Days recorded | Peak (cfs) |
|---|---|---|---|---|
| 2003 | 36 | 6th lowest of 15 · 57% of median | 115 | 0.2 |
| 2004 | 63 | 8th lowest of 15 · 100% of median | 39 | 1.9 |
| 2005 | 147 | 15th lowest of 15 · 233% of median | 125 | 1.9 |
| 2006 | 5 | 3rd lowest of 15 · 8% of median | 48 | 0.4 |
| 2007 | 1 | 2nd lowest of 15 · 2% of median | 9 | 0.4 |
| 2008 | 86 | 10th lowest of 15 · 136% of median | 86 | 1.1 |
| 2009 | 24 | 5th lowest of 15 · 38% of median | 44 | 0.9 |
| 2010 | 22 | 4th lowest of 15 · 35% of median | 29 | 0.7 |
| 2019 | 94 | 11th lowest of 15 · 149% of median | 35 | 1.4 |
| 2020 | 0 | 1st lowest of 15 · 0% of median | 1 | 0.0 |
| 2021 | 107 | 12th lowest of 15 · 170% of median | 58 | 1.4 |
| 2022 | 113 | 14th lowest of 15 · 179% of median | 72 | 1.6 |
| 2023 | 109 | 13th lowest of 15 · 173% of median | 131 | 0.5 |
| 2024 | 73 | 9th lowest of 15 · 116% of median | 61 | 1.2 |
| 2025 | 57 | 7th lowest of 15 · 90% of median | 77 | 0.5 |
Trends for this structure
Recorded use shows no clear trend over its last 15 recorded years — which is itself worth knowing.
How good is our record of it?
Grade B (8/10 points) — the components below are the finding; the letter alone is not.
The rubric, component by component
| Check | State | Detail |
|---|---|---|
| identity | complete | name, type, and water source all on file |
| decreed rights | on file | 2 right(s), seniority decoded |
| diversion record | present | 15953 measured days; currency unknown (no data-coverage date to compare against) |
| record continuity | patchy | 65% of the irrigation seasons in 1911-2025 carry measured days |
| published-record stability | stable | no upstream revisions recorded against this structure |
Advisory reading aid on public data — not an administrative or legal conclusion, not a title opinion, and not a substitute for DWR administration or an engineer's analysis. Methodology review status is disclosed at hydrohistorian's basin pages.