← My Water  ·  Print / save as PDF

KELLER PUMP (ZOELLER)

Structure dossier · WDID 1500710 · 1 · SAINT CHARLES RIVER · DWR record

Where this page's figures come from

Generated 2026-08-27 19:49 by Hydrohistorian. Sources: DWR HydroBase snapshot HydroBase_CO_20260707 (history) + CDSS REST (current), USGS NWIS cross-checks. Engine v0.5.0 (2deb1d7) — every figure regenerates from this named code version and data image.

Where it sits in line

Priority 1866-12-3138th most senior of the 704 structures with decreed rights in this water districtDWR's administrative subdivision of a river basin; the unit calls are usually stated in..

Under prior appropriationColorado's rule for sharing water: first in time, first in right. Age decides, not proximity or need., everything ahead of it in this line is satisfied in full before it receives any water. Immediately ahead: POLLARD DITCH (1866-12-15). Immediately behind: BLUNT (CHAMBERS) PUMP (1867-01-08).

Decreed rights (5)

Admin noDWR's numeric encoding of a water right's seniority. Smaller is more senior; the integer part counts days from 1849-12-31 to the date that ranks the right. AppropriatedWhen water was first put to beneficial use. It sets seniority unless a prior adjudication date is later. AdjudicatedWhen the water court confirmed the right. A use decreed in 1975 was not a decreed use in 1955, however old the appropriation is. AbsoluteA right actually put to use, as opposed to conditional -- a placeholder for a use not yet made. ConditionalA right reserving a place in line for a use not yet made; it must be diligently pursued or it lapses. UnitsUsesWhat the court said this water may be used for -- irrigation, municipal supply, augmentation and so on.Case
6209.01866-12-311893-06-26 1.60.0 CIRRMUN 31
8766.01873-12-311893-06-26 0.20.0 CIRRMUN 81
12053.01882-12-311893-06-26 0.80.0 CIRRMUN 143
12784.01884-12-311893-06-26 0.80.0 CIRRMUN 152
14610.01889-12-311893-06-26 0.70.0 CIRRMUN 186

Advisory reading aid on public data — not an administrative or legal conclusion, not a title opinion, and not a substitute for DWR administration or an engineer's analysis. Methodology review status is disclosed at hydrohistorian's basin pages.