← My Water  ·  Print / save as PDF

BLACK DIKE DITCH

Structure dossier · WDID 3200509 · 1 · MCELMO CREEK · DWR record

Where this page's figures come from

Generated 2026-08-28 00:40 by Hydrohistorian. Sources: DWR HydroBase snapshot HydroBase_CO_20260707 (history) + CDSS REST (current), USGS NWIS cross-checks. Engine v0.5.0 (f6d7fdc) — every figure regenerates from this named code version and data image.

Where it sits

Location as DWR records it. Faint dots are the neighbouring water; click any to open it.

Which of its rights are out of priority?

Not computable for this structure: this structure is not on the modelled flow network, so no reference gage can honestly stand in for it.

Where it sits in line

Priority 1889-04-15127th most senior of the 638 structures with decreed rights in this water districtDWR's administrative subdivision of a river basin; the unit calls are usually stated in..

Under prior appropriationColorado's rule for sharing water: first in time, first in right. Age decides, not proximity or need., everything ahead of it in this line is satisfied in full before it receives any water. Immediately ahead: GREEN DITCH (1888-06-15). Immediately behind: KELLY PLACE PUMP (1889-04-15).

Decreed rights (1)

Admin noDWR's numeric encoding of a water right's seniority. Smaller is more senior; the integer part counts days from 1849-12-31 to the date that ranks the right. AppropriatedWhen water was first put to beneficial use. It sets seniority unless a prior adjudication date is later. AdjudicatedWhen the water court confirmed the right. A use decreed in 1975 was not a decreed use in 1955, however old the appropriation is. AbsoluteA right actually put to use, as opposed to conditional -- a placeholder for a use not yet made. ConditionalA right reserving a place in line for a use not yet made; it must be diligently pursued or it lapses. UnitsUsesWhat the court said this water may be used for -- irrigation, municipal supply, augmentation and so on.Case
14350.01889-04-151962-08-14 13.1250.0 CIRR 62-8

Recorded use (last 15 years on record)

In a median year this structure has a recorded diversion of 3,559 AF. Its most recent year on record, 2025, came in at 4,590 AF — 129% of that, and 12th lowest of the 15 years with a recorded volume.

This structure records both diversions and reservoir releases — they are separate water movements and are accounted separately below.

YearDiverted (AFA volume: one acre covered a foot deep, about 326,000 gallons -- roughly a suburban household's outdoor use for a year.)Compared with its own recordReleased (AF)Days recordedPeak (cfs)
2011 3,972 10th lowest of 15 · 112% of median 3,225 217 12.9
2012 2,488 4th lowest of 15 · 70% of median 1,665 235 7.4
2013 2,874 5th lowest of 15 · 81% of median 2,195 204 11.0
2014 3,559 8th lowest of 15 · 100% of median 2,119 238 11.5
2015 3,318 6th lowest of 15 · 93% of median 1,955 268 11.6
2016 4,956 14th lowest of 15 · 139% of median 3,680 288 13.9
2017 4,593 13th lowest of 15 · 129% of median 2,956 288 10.9
2018 2,402 3rd lowest of 15 · 68% of median 1,263 178 9.8
2019 3,895 9th lowest of 15 · 109% of median 2,485 223 15.3
2020 5,334 15th lowest of 15 · 150% of median 3,555 238 16.9
2021 2,388 2nd lowest of 15 · 67% of median 1,385 177 11.7
2022 1,807 1st lowest of 15 · 51% of median 911 224 11.2
2023 4,583 11th lowest of 15 · 129% of median 3,667 198 15.9
2024 3,492 7th lowest of 15 · 98% of median 2,748 248 11.2
2025 4,590 12th lowest of 15 · 129% of median 3,663 288 13.8

How good is our record of it?

Grade B (8/10 points) — the components below are the finding; the letter alone is not.

The rubric, component by component
CheckStateDetail
identity complete name, type, and water source all on file
decreed rights on file 1 right(s), seniority decoded
diversion record present 9672 measured days; currency unknown (no data-coverage date to compare against)
record continuity patchy 72% of the irrigation seasons in 1963-2025 carry measured days
published-record stability stable no upstream revisions recorded against this structure

Advisory reading aid on public data — not an administrative or legal conclusion, not a title opinion, and not a substitute for DWR administration or an engineer's analysis. Methodology review status is disclosed at hydrohistorian's basin pages.