← My Water  ·  Print / save as PDF

ROGERS PIT DIVERSION POINT 1

Structure dossier · WDID 0200541 · DITCH · SOUTH PLATTE RIVER · DWR record

Where this page's figures come from

Generated 2026-08-28 02:45 by Hydrohistorian. Sources: DWR HydroBase snapshot HydroBase_CO_20260707 (history) + CDSS REST (current), USGS NWIS cross-checks. Engine v0.5.0 (0576005) — every figure regenerates from this named code version and data image.

Where it sits

Location as DWR records it. Faint dots are the neighbouring water; click any to open it.

Current administration

● Fully called out — call at LOWER LATHAM DITCH (SOUTH PLATTE RIVER, priority 1877-11-14).

● Fully called out — call at WESTERN MUTUAL DITCH (SOUTH PLATTE RIVER, priority 1871-08-09).

● Fully called out — call at HARMONY DITCH 1 (SOUTH PLATTE RIVER, priority 1897-05-02).

● Fully called out — call at SOUTH PLATTE RIVER COMPACT (SOUTH PLATTE RIVER, priority 1897-06-13).

● Fully called out — call at LOWER PLATTE BEAVER D (SOUTH PLATTE RIVER, priority 1888-04-14).

Which of its rights are out of priority?

Not computable for this structure: this structure is not on the modelled flow network, so no reference gage can honestly stand in for it.

Where it sits in line

Priority 1991-12-3110683rd most senior of the 21881 structures with decreed rights in this water districtDWR's administrative subdivision of a river basin; the unit calls are usually stated in..

Under prior appropriationColorado's rule for sharing water: first in time, first in right. Age decides, not proximity or need., everything ahead of it in this line is satisfied in full before it receives any water. Immediately ahead: 0200524 (1991-12-31). Immediately behind: 0200542 (1991-12-31).

Decreed rights (1)

Admin noDWR's numeric encoding of a water right's seniority. Smaller is more senior; the integer part counts days from 1849-12-31 to the date that ranks the right. AppropriatedWhen water was first put to beneficial use. It sets seniority unless a prior adjudication date is later. AdjudicatedWhen the water court confirmed the right. A use decreed in 1975 was not a decreed use in 1955, however old the appropriation is. AbsoluteA right actually put to use, as opposed to conditional -- a placeholder for a use not yet made. ConditionalA right reserving a place in line for a use not yet made; it must be diligently pursued or it lapses. UnitsUsesWhat the court said this water may be used for -- irrigation, municipal supply, augmentation and so on.Case
51864.01991-12-311991-12-31 0.0300.0 CSTO

Recorded use (last 10 years on record)

In a median year this structure has a recorded diversion of 576 AF. Its most recent year on record, 2025, came in at 397 AF — 69% of that, and 5th lowest of the 10 years with a recorded volume.

YearDiverted (AFA volume: one acre covered a foot deep, about 326,000 gallons -- roughly a suburban household's outdoor use for a year.)Compared with its own recordDays recordedPeak (cfs)
2014 789 7th lowest of 10 · 137% of median 19 63.2
2015 1,874 8th lowest of 10 · 326% of median 140 83.7
2018 2,916 10th lowest of 10 · 507% of median 83 60.0
2019 260 3rd lowest of 10 · 45% of median 19 8.1
2020 2,853 9th lowest of 10 · 496% of median 80 34.7
2021 307 4th lowest of 10 · 53% of median 10 43.9
2022 754 6th lowest of 10 · 131% of median 39 24.9
2023 86 2nd lowest of 10 · 15% of median 3 25.4
2024 0 1st lowest of 10 · 0% of median 61 0.0
2025 397 5th lowest of 10 · 69% of median 304 42.3

How good is our record of it?

Grade B (7/10 points) — the components below are the finding; the letter alone is not.

The rubric, component by component
CheckStateDetail
identity complete name, type, and water source all on file
decreed rights on file 1 right(s), seniority decoded
diversion record present 758 measured days; currency unknown (no data-coverage date to compare against)
record continuity sparse 31% of the irrigation seasons in 2014-2025 carry measured days
published-record stability stable no upstream revisions recorded against this structure

Advisory reading aid on public data — not an administrative or legal conclusion, not a title opinion, and not a substitute for DWR administration or an engineer's analysis. Methodology review status is disclosed at hydrohistorian's basin pages.