← My Water  ·  Print / save as PDF

0805843

Structure dossier · WDID 0805843 · DWR record

Where this page's figures come from

Generated 2026-08-28 09:24 by Hydrohistorian. Sources: DWR HydroBase snapshot HydroBase_CO_20260707 (history) + CDSS REST (current), USGS NWIS cross-checks. Engine v0.5.0 (0576005) — every figure regenerates from this named code version and data image.

Current administration

● Fully called out — call at LAST CHANCE DITCH 2 (SOUTH PLATTE RIVER, priority 1863-12-30).

● Fully called out — call at NEVADA DITCH (SOUTH PLATTE RIVER, priority 1865-12-30).

Which of its rights are out of priority?

Not computable for this structure: this structure is not on the modelled flow network, so no reference gage can honestly stand in for it.

Where it sits in line

Priority 1962-04-104747th most senior of the 21881 structures with decreed rights in this water districtDWR's administrative subdivision of a river basin; the unit calls are usually stated in..

Under prior appropriationColorado's rule for sharing water: first in time, first in right. Age decides, not proximity or need., everything ahead of it in this line is satisfied in full before it receives any water. Immediately ahead: 0807999 (1962-04-08). Immediately behind: 0805720 (1962-04-12).

Decreed rights (1)

Admin noDWR's numeric encoding of a water right's seniority. Smaller is more senior; the integer part counts days from 1849-12-31 to the date that ranks the right. AppropriatedWhen water was first put to beneficial use. It sets seniority unless a prior adjudication date is later. AdjudicatedWhen the water court confirmed the right. A use decreed in 1975 was not a decreed use in 1955, however old the appropriation is. AbsoluteA right actually put to use, as opposed to conditional -- a placeholder for a use not yet made. ConditionalA right reserving a place in line for a use not yet made; it must be diligently pursued or it lapses. UnitsUsesWhat the court said this water may be used for -- irrigation, municipal supply, augmentation and so on.Case
41007.01962-04-101972-12-31 0.0550.0 CDOMSTK

How often is it out of priority?

Across the 8 seasons whose call record is complete enough to judge this structure (2017, 2018, 2020, 2021, 2022, 2023, 2024, 2026), week by week from April. Read these as counts, not rates — 8 seasons is a short record.

most senior right · admin 41007.00000 · peaks at 7 of 8 seasons
AprMayJunJulAugSep
Why only 8 seasons, and what the bars mean

Each bar is one week: how many of those seasons that right was out of priority under a call this site can lawfully attribute to this structure. Green is never, red is every season on record.

The short record is a property of DWR's data, not of the river. A call only counts against a structure when we can establish it applies — by the districts named in its set comments, or by stream mile on the same source. DWR did not begin stating affected districts routinely until about 2015: fewer than one call in ten can be judged before then, against roughly two in three since. A season we cannot judge is not a season without calls, so it is dropped rather than counted as quiet — 15 seasons dropped here.

This is a frequency over past seasons, not a forecast. It says nothing about what the division engineer will do this year.

How good is our record of it?

Grade C (5/10 points) — the components below are the finding; the letter alone is not.

The rubric, component by component
CheckStateDetail
identity partial missing name, structure type, water source
decreed rights on file 1 right(s), seniority decoded
diversion record absent no diversion records cached
record continuity unknown no record span to measure against
published-record stability stable no upstream revisions recorded against this structure

Advisory reading aid on public data — not an administrative or legal conclusion, not a title opinion, and not a substitute for DWR administration or an engineer's analysis. Methodology review status is disclosed at hydrohistorian's basin pages.